My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/11/1994 CONSERVATION COMMISSION Minutes
>
8/11/1994 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 5:24:03 PM
Creation date
2/23/2018 1:24:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/11/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- <br /> 9:10 0 O E T R. ALLEN to license and maintain two existing <br /> groins in Waquoit Bay at 53 Seconsett Paint Road, Jeff <br /> Johnson presenting. <br /> Mr. Sherman advised this is to obtain chapter 91 licensing. <br /> There is no objection to the usual language. He would want <br /> to see the pathway through the dune grass shown on the plan. <br /> Mr. Johnson stated it is on the plan; it is 2 feet wide and <br /> is there now. <br /> Mrs. Ferriday stated maintenance will not include the <br /> revetment. Ir. Johnson stated it is not part of the <br /> application; no work is proposed. The groins are actively <br /> trapping sediment. <br /> DEP number and comments have not been received. <br /> Public comments were requested: none.. <br /> VOTE; Motion made and seconded to close pending DEP number Y <br /> and comments. <br /> CLOSE PE I I G <br /> ROBERT C* HENDLER to raze an existing five bedroom <br /> house, construction of' a four bedroom house, new Title <br /> system, replacement of lawn, blue-stone walkway, and <br /> replacement of asphalt drive with crushed ste 'at 156 <br /> Popponesset Island Road* Mario Diregorio presenting with <br /> Roger McNevish and Anthony Ferraga mo. Abutter notification <br /> receipts were provided# <br /> FirstP lan is a site plan of existing conditions, except for <br /> the proposed pier which has been licensed locally. <br /> Second is the septic which '.s an upgrade to Title V and has <br /> been approved by the Board of Health* <br /> Third is the site improvement plan with the house and <br /> landscaping. 1t is within doastal flood zone 13 to All. it <br /> is outside the estimated habitat which includes Popponesset <br /> Spit but not the Island. The project is in Land Subject To <br /> Coastal storm Flowage and buffer zone. The existing five <br /> bedroom house will be razed and asphalt will be replaced. A <br /> four bedroom house with elevated deck will be built almost <br /> within the footprint of the existing house, There are two <br /> resource area . on the site, salt marsh and armored coastal <br /> bank permitted in 1991 . <br /> Meavy equipment will be used on the north side of the house. <br /> There will be a construction work limit alone the perforated <br /> line. There is a secondary work limit at the planting zone. <br /> There will be a siltation fence around the demolition and <br /> construction of the new house, Haybales will be staked. <br /> Debris will be trucked off-site on a daily basis and they <br />
The URL can be used to link to this page
Your browser does not support the video tag.