Laserfiche WebLink
CONTINUED To OCTOBER 61 1994 AT P,M. <br /> 7:40 DAVID BERNSTEINI 33 SeconsettPoint Toad, continued <br /> from 11 August 1994. Jack Landers- auley presenting .with Mr. <br /> Bernstein. They have worked with Bonito on this. It is <br /> implicit that access is limited to one spot to the southeast <br /> side of the house. work is to be done from the upland. The <br /> slope of the existing wall on Lot 19 and Mr, Bernstein's wall <br /> will be on the sane angle. From a construction standpoint, <br /> at the intersection of the old wall, they intend to grout the <br /> crevices, Wherever it is stopped, the filter fabric rust <br /> end, On the north side, there is an existing, poorly built, <br /> rip-rap walk.; there is a minor encroachment that will be <br /> taken down, At this end, it will have a 6 foot return. <br /> Coarse stone will be placed behind the sheathing. <br /> Ir. Bernstein advised the properties were originally bought <br /> simultaneously. <br /> Mr. Homeyer asked if it would not be better to use chink <br /> stone rather than mortar <br /> Mr. Landers- auley advised the- neighbor wants it mortared, <br /> Ir. Homeyer could understand doing the neighbor's portion in <br /> kind but no further, <br /> Mr, Landers-Caul.ey stated most of the problem from a moon <br /> tide cones through the crevices; Hurricane Bob did not <br /> overtop elevation 7 . It was noted this is A zone and is on <br /> the plan. <br /> Mrs. Ferriday asked for a narrative on demolition; receipts <br /> will be requested. Information was provided in <br /> They will only lay 1 -20 feet of wall per day, <br /> Ir. Sherman stated there should be an on-site prior to start <br /> f work.. <br /> Mr. Fitzsimmons stated the drawing should reflect what is <br /> actually going to be dome and the large stones shown. <br /> Mr. Homeyer would want a notice signed that the Order of <br /> Conditions have been react and understood. Mr. Sherman <br /> agreed; this will be clone at the on-site, before <br /> construction. He asked for details on what will be done for <br /> revegetation at the top of the wall.. <br /> Mr, Bernstein would want to keep the lawn, Mr, Sherman felt <br /> it would be advantageous to keep a narrow row of shrubbery. <br /> Mr. Bernstein would prefer to keep it as he has hal it but if <br /> told to do otherwise, he will . <br /> Public comments: none. <br /> VOTE: Motion made and seconded to close upon receipt of a <br />