My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/8/1994 CONSERVATION COMMISSION Minutes
>
9/8/1994 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 5:28:11 PM
Creation date
2/23/2018 1:26:00 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/08/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> I <br /> .` <br /> new plan with the conditions discussed. <br /> An on-site with the Agent, contractor and engineer will be <br /> conditioned. <br /> CLOSE UPON RECEIPT, <br /> 7; PATRICK J, DEMPSEY to replant a disturbed area and <br /> installation of a split rail fence at 35 Pickerel Cove Road, <br /> Judy Dempsey presenting, <br /> Mr, Sherman advised there was removal of vegetation on the <br /> bank. They plan to replant with various shrubs. <br /> irs. Dempsey sey advised they are proposing Japanese Junipers, <br /> c toneas ers, and english .ivy in the bare spots; it will be <br /> `finished by a split rail fence. <br /> Mr,. Sherman btated this is the result of an Enforcement <br /> order. He agreed the plant species are appropriate. <br /> Abutter notification receipts to be provided. <br /> Public comments were requested: none. <br /> VOTE: Motion rade and seconded to close upon receipt o <br /> abutter notification receipts. <br /> CLOSE UPON RECEIPT. <br /> 5-D CONSTRUCTION Co. j INC,. to construct and maintain a <br /> single family dwelling; attached deck; wooden stairs down a <br /> bank; on-site sewage disposal system; and regrading at 28 <br /> Tradewind Drive, Jack Landers--Cauley presenting with <br /> Margaret Fitzgibbons. Abutter notification receipts were <br /> provided. Modifications to the plan were done at the request <br /> of the Agent and new plans provided. The changes are: <br /> 1 . Stairs were mored 5 ft@ to the south because of two <br /> trees. A platform proposed at the top and bottom, <br /> . It was requested to move the house 10 ft. away from the <br /> bank. This could not be done because of a- variance <br /> received from the Board of Health. It was moved 5 ft. <br /> The deck was within the 50 ft. buffer; it is now 49 ftqp <br /> Location of staled bales moved 5 ft. away, <br /> i <br /> They have modified the grading; it is to the upland side o <br /> the 50 ft. lime. Proposed elevations are shown. They will <br /> not go any further than the staked bales of straw. <br /> r. Sherman asked how it will be -maintained that they will <br /> not work in that zone, Ms Fitzgibbons advised she has built <br /> 16 homes since last March and asked if she could assure the <br /> Board the contractors will not exceed the limit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.