Laserfiche WebLink
NEARING CONTINUED To SEPTENBER 22, 1994 AT P. +I. <br /> 8:10 THOMAS M. QUINN to remove dock remains and reconstruct <br /> pier*. rFamp and float in accordance with license #5625 at <br /> 130 Summersea Road. Dave Sanicki presenting. Mrs, Ferriday <br /> stepped down as a direct abutter. Abutter notification <br /> receipts were provided. The pre-existing dock has an <br /> approved licensed plan recorded in 1970' which they wish to <br /> rebui l'd. The float will have two feet of water at Mean Low, <br /> ortolotti obtained an emergency order from the Board of <br /> Health to install a septic system and should have had a <br /> After The Fact filing with the Commission. They are asking <br /> to amend the order of Conditions. <br /> Mr. Sherman stated it will be necessary to hold another <br /> hearing pro forma. <br /> Mr, Homeyer asked if they had a contingency plan for height <br /> if Chapter 91 insists on the public access issue? <br /> Mr. sanicki stated if the Commissibn warts to elevate this, <br /> it can be conditioned. <br /> It was agreed the Agent would meet with Mr. sanicki at .the <br /> site to determine if any portion has to be elevated. <br /> Mr, Hoeyer questioned access to the dock. He was told the <br /> owner will take a random pati from the douse and if there is <br /> an erosion problem, they will cope back to the Commission, <br /> Mr. Quinn does not own a boat and will not buy a boat until <br /> he can rebuild t-he structure as a permitted dock. The <br /> Commission can condition draft or horsepower, if they wish; <br /> e can then go forward with the reconstruction. <br /> Mrs. Ferriday pointed to the abutting docks and asked how <br /> they will be accessed when this one is built? Mr.. Sanicki <br /> stated he had no idea, <br /> Mr. Homeyer stated there will definitely be a problem with <br /> access from the house to the dock. <br /> The Commission agreed it would be conditioned that use will <br /> be monitored. <br /> VOTE: Motion made and seconded to close and condition annual <br /> site visits to monitor access to the dock from the <br /> louse for erosion. The Agent will greeton-site with <br /> the engineer to determine whether the dock should be <br /> elevated. <br /> HEARING CLOSED. <br /> 8:20 STR TFORD PONDS - Carl Grassetti was invited in to <br /> discuss the last order of Conditions re replication which was <br /> to be done this past spring and was not done. <br />