Laserfiche WebLink
side of the house, they will remove the entire structure. <br /> Debris will be trucked off site, <br /> Proposed is a three bedroom house with deck and enclosed <br /> porch constructed within the old footprint, The deck will be <br /> 2 feet further back from the salt marsh, The foundation will <br /> be 2 feet -closer to the salt Marsh in order to fulfill Title <br /> V requirements. The foundation will be flood proofed. Leavy <br /> equipment will enter from the north side. There will be no <br /> storage of materials south of the dwelling. Between the <br /> house and the salt marsh it will be planted with native <br /> species around the buffer zone. Appendix A lists the <br /> species. They are looking for 0 survival rate. There is a <br /> drip line around the house. The existing driveway will be <br /> removed and planted with evergreen trees. <br /> Mrs. Ferriday asked if the new driveway would be paved? <br /> Mr. DiGregorio stated it would because of problems in the <br /> winter with plowing. Mrs. Ferriday asked if permeable would <br /> be better. lir. Gordon stated it would be very difficult <br /> taking care of anything that large if not paved. <br /> Mr, Sherman stated it will not affect a resource area <br /> Mr. DiGregorio stated south of the house will be mulched and <br /> planted with rare for stabilization. There is no lawn <br /> proposed. The project as proposed Meets performance <br /> standards. <br /> 1r. Sherman stated it is a good project, well designed; He <br /> asked if they would have any objections to backing up the <br /> silt fences with snow fences. Mr. Gordon was agreeable. He <br /> advised he was hoping to build this winter, He will be <br /> coming back in for a dock permit, with a walkway from the <br /> deck to the dock, The deck is 12 feet above grade. <br /> Mr. Sherman stated architectural plans will be requested <br /> before the order of Conditions is issued. Mr. Gordon stated <br /> at least in draft form. <br /> Mr, Desrosiers requested details on the amount of french <br /> drain. <br /> Mr. DiGregorio advised proposed is 1211 x 1211, Mr, Desrosiers <br /> did not feel that would cover runoff.. Mr, Gordon will <br /> provide details on this and will make it wider than the 12" . <br />