Laserfiche WebLink
Mr. Fitzsimmons questioned the wording "or there' . Mr. <br /> Tavares stated when designed, they were thinking of different <br /> types, They were looking for someone who could do round <br /> forms. He offered to crass that phrase out. It was agreed <br /> when the new plan is provided, this will be omitted. <br /> Mr. Homeyer asked if the interlocking arrangement that he <br /> brought in on the Marsters project would be more <br /> satisfactory. Mr. Tavares stated they do not need sediment <br /> control on this site. <br /> Mr. Fitzsimmons asked if the top of bank is shown as a solid <br /> line and also dotted line? <br /> Mr. Tavares stated on one side the definition is given by the <br /> 11 foot contour, that is the top of the coastal bank but <br /> changes on the other side put it greater than I - 4; this <br /> side has two definitions. This is also a velocity zone <br /> Mr. Fitzsimmons asked if there is a change in to o between <br /> the original plan and this one. There is none. <br /> Mr. Tavares advised it is the intent to put the fence at the <br /> end of the existing fence along the slope at the property <br /> lime. A plan will be color coded for the next meeting. <br /> CONTINUED TO DECEMBER 1 , 1994 AT 8:00 P,1, <br /> 7:40 DINTT E, GORDON JR,- to demolish and remove an <br /> existing four bedroom single family dwelling and to construct <br /> a three bedroom dwelling in the buffer zone to the salt marsh <br /> at 408 Monooscoy Road, Mario Diregorio presenting with <br /> Roger Mcevish and Mr. Gordon. <br /> Mr. Homeyer advised he serves on the Waterway committee with <br /> Mr* Gordon and will step down if anyone wishes. No one had <br /> any objection. <br /> Mr, DiGregorio advised there is a salt marsh bordering. The <br /> house is 4 bedrooms existing with elevated deck, gravel <br /> drive, and septic with two flow diffuser systems, The Heard <br /> of Health has reviewed the project and the septic is <br /> sufficient for- the new dwelling. There is an existing mowed <br /> area that is denuded. Demolition will be accomplished with a <br /> siltation fence along the entire limit of work, 5 feet off <br /> the deck. It is not in the ACEC or Estimated Habitat zone. <br /> It is in the flood plain L GsF . working from the north <br /> i <br />