Laserfiche WebLink
Mrs. Ferriday asked if they had architectural plans Mr. <br /> enway will submit them, This is a two bedroom house, It i <br /> going through the courts and a deed has to be drawn. <br /> Mr, Sherman advised the attestation of ownership from the <br /> Town Treasurer is needed. <br /> Mr. Raymond faxed the information to DEP that they had '-..} <br /> notified was missing. .� <br /> Mr. Sherman stated Mr, Benway and Mr. Raymond have worked <br /> hard to create the 50 foot NVBS, <br /> Mr. Green stated the five feet around the foundation is going <br /> to he difficult to maintain. <br /> Public comments <br /> John Kelleher, abutter, advised the well is for drinking <br /> water; it is under cover. <br /> Mr. Sherman stated it i a Board of Health issue, he should <br /> contact then. <br /> YOTE: oti n made and seconded to close upon receipt of <br /> Attestation of ownership, architec . ral plans, DFP <br /> number, Board of Health approval, variance confirmation <br /> from Board of Appeals. <br /> Mr. Sherman will be providing a letter to Board of Appeals. <br /> CLOSE PENDING. <br /> 8:30 AVRAN GOLDBERG for reconstruction of an existing <br /> retaining wall, existing deck platform alone pond shore; <br /> approval of maintenance pruning activity; licensing of two <br /> pier structures and irrigation intake pipe to coincide with <br /> Chapter 91 licensing at 160 South Sandwich Road, Jeff Colby - <br /> presenting. <br /> Mr. Iesros ier-s stepped down as an abutter, <br /> There is a retaining wall and deck existing, The deck is <br /> deteriorating as is the retaining wall . There is also an <br /> intake pipe and pump located underneath the deck for <br /> irrigation purposes which has been there for many gears. <br /> There is a dock proposed at the Besse house location similar <br /> to the pier existing. There is pruning activity that had <br /> occurred at the top of .the bank adjacent to the house; it is <br /> maintenance pruning. <br /> Mrs. Ferriday stated the staked work limit is just landward <br /> of the water lime for the retaining wall . <br /> Mr. Homeyer asked the design of the dock? The existing dock <br /> on the Goldberg property is seasonal and is aluminum. The <br /> pipes are removed that cote down off the dock and sit on the <br /> bottom of the pond. He asked if the decking is solid? <br /> Pictures were shown and it was. <br /> 4 <br />