Laserfiche WebLink
y <br /> i <br /> Mrs. Ferriday asked the size of the float and was told it is <br /> 10 x 5, she stated it should be shown on the plan. Mr. <br /> Colby stated it is- on the cross section. The proposed will <br /> be one-half the size. <br /> Mr. Homeyer asked what keeps the deck in place and was told <br /> it is attached to the legs. Pins keep it from sliding. <br /> } <br /> Asked if ithe irrigation pipe is plastic tubing, Mr. Colby r. <br /> stated that was correct. It is not removed, it is still <br /> there. The pump sits on the retaining wall .. <br /> Mr. Nomeyer asked if the state addressed the issue of <br /> drawdown? Mr. Sherman will check; he has to file under that <br /> category. <br /> Mr. Colby advised drawdown calcs were in the Notice of <br /> Intent. It is a 729 acre pond. 1f it ran for two weeks non- <br /> stop, twenty-four hours per day, it would be 1/100th of an <br /> inch. <br /> Mr, Sherman asked, the pr1u ing, how often will it be done as <br /> maintenance? It is generally done every three years advised <br /> Ed Smith,, the Caretaker. <br /> Mr. Sherman stated it will be conditioned to be done every <br /> three years with notice to the Commission when being none. <br /> Public comments: none, <br /> VOTE: Motion made and seconded to close upon receipt of DEP <br /> number and Board of Appeals, if necessary. <br /> To BE CLOSED UPON RECEIPT <br /> 8:40 KATHRYN SOMMERS- to amend the order of conditions for SE <br /> -1201 to change the interior floor plan and to move the <br /> corner footings at 30 sand Dollar Lane, Mr. & Mrs, Soarers <br /> presenting. <br /> The Chairman advised this hearing falls under Regulation #29 <br /> and #30 of the Mashpee bylaw. <br /> Mr. Sommers advised they purchased the property three months <br /> ago. They wish to expand the bedroom and make a study adding <br /> feet on the west side of the house. The study will not <br /> have closets or doors. <br /> Mr, Sherman stated they will need architectural plans with <br /> the floor layout. They will have the plans within ,four <br /> weeks, It is going to the Architectural Review committee. <br /> It was agreed to continue for four weeks. <br /> Public comments: none. <br /> VOTE: Motion made and seconded to continue the hearing for <br /> Kathryn Sommers to 16 February 1995 a :20 p.m. <br />