Laserfiche WebLink
She stated the next area would be 0-100 feet from the top o <br /> the bank. They have a 20 f x 401 pool approved in the <br /> spring. <br /> Mr. Sherman stated it was and was not approved. He read from <br /> the RDA that the request was for approval of the concept and <br /> location, not the construction. In order to legalize t1 <br /> pool, he requested an amended first page of the Notice of <br /> Intent with the pool being part of it with the additional <br /> appropriate fees paid. <br /> Nis Leblanc stated the pool is at elevation -1/ ; the entire <br /> site slopes down. Mr. Sherman stated within 50 years the <br /> pool will be in the ocean. <br /> Ms Leblanc advised Hoxie will be doing the planting. <br /> Mr. Sherman stated he- would like to keep the height at 1 <br /> inches and mowing during the winter season, November to <br /> March. Ms Leblanc advised this is an imported weed and is <br /> not native, <br /> Public comments: none. <br /> VOTE: Motion made and seconded to close the hearing pending <br /> DEP number and receipt of revised corer sheet for the <br /> Notice of Intent and receipt of additional. fees. <br /> Unanimous Vote. <br /> VOTE: Motion made and seconded that, as a policy, the <br /> omission will not accept concepts from now on. <br /> Unanimous Vote. <br /> HEARING CLOSED PENDING, <br /> CoCls Handout - Procedures: The reps require certification <br /> by the engineer, in writing, if the filing included a stamped <br /> plan by thea initially, at the time of the request for the <br /> Certificate of Compliance. <br /> A letter to be sent to the engineers. This should also be a <br /> standard in every Order of Conditions, <br /> Conditions for negative determinations were distributed for <br /> review. <br /> OTE: Lotion made and seconded to accept the recommended <br /> special conditions for negative determinations with <br /> description of the project. <br /> -A1 # A letter was seat to the Attorney General . MACC is <br /> sending a similar letter. <br /> NCD FINES: A public hearing is necessary for NCD fines re <br /> meeting the requirements in the order of Conditions. <br /> Mr, Homeyer stated the Commission still has the requirement <br /> under state statute. <br />