Laserfiche WebLink
Mr. Sherman stated post-construction review can be <br /> conditioned. <br /> Mr , Botelho showed a plan of the contact station. It will be <br /> on a skid; it was not envisioned to have any foundation. It <br /> would be removeable if a major storm is forecast. <br /> A general plan of the entire area was previewed. They will <br /> maintain Great oak Road access to the town beach at all <br /> times. <br /> Mrs. Ferri <br />