Laserfiche WebLink
6/15/95 - <br /> certain lots, when the hook-ups are done, they will be done <br /> with a meeting between the Agent and the contractor, Mr. <br /> Dowling agreed. <br /> Mr. Kelley advised 163 abutters were notified. <br /> Mr. Dowling advised service connections will be driven. <br /> Public comments: none. <br /> NOTE: Motion rade and seconded to close the hearing with the <br /> condition that the Agent be consulted when moving into <br /> sensitive areas before they dig. Unanimous Vote, <br /> HEARING CLOSED, <br /> AFTER HEARING AGENDA <br /> The Agent advised the Commission of the situation with the <br /> Town Planner and Building Inspector reappointments. <br /> NOTE: Motion grace and seconded that a letter of support he <br /> written for Tom Fudala and Dill Hauck, <br /> Unanhaous Vote, <br /> MAGC: There was a discussion of the increased cast of dues. <br /> Mr, Rosenberg spoke in favor of paying the dues, To be <br /> discussed next agenda. <br /> PIRATES COVE ASSOC, : A request was received for permission to <br /> coo the work after the annual meeting of the Association. The <br /> Agent suggested it be done September or October. <br /> VOTE: Motion mace and seconded to permit Pirates Cove <br /> Association to complete the required work during <br /> September to October 1. Unanimous Note. <br /> It was noted the hearing schedule has changed for the <br /> remainder of the year. July meetings will be the 13th and <br /> 27th; August 10 and 4; September 7 and 21; October 4 and 18; <br /> November 2 , 16 and ; and December 14 and 28, <br /> RADSHA T: The Agent advised when at the site for a <br /> Certificate of Compliance inspection, he noted the dock was <br /> the correct size and in the right Location but the water <br /> depths were not the same as on the original plan; an as-built <br /> was requested. The project was conditioned for what was <br /> presumed to be there and it is not, A letter was sent. to DMF <br /> to look at current conditions and give an opinion. <br /> Roger Mcevish stated the original plan was prepared with <br /> soundings. The distance between bottom elevation and a datum <br /> of o. 0 based on M , that is a water leve] that occurs for a <br /> short period of time; other times it is high or low, There <br /> are tines every day when lower than 0, 0, For this project <br /> they had taken soundings over a range of areas and had n <br /> idea where the dock was doing or how long it would be. A 95 <br /> foot limit was proposed with 2 .71 ten feet off the end of the <br /> foo} . 1n his opinion, a sounding within 10 feet of the <br /> structure is pretty close, as are the others. As you look <br />