My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/13/1995 CONSERVATION COMMISSION Minutes
>
7/13/1995 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 5:23:15 PM
Creation date
2/23/2018 1:47:37 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
07/13/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 July 1995 <br /> Page 8 . <br /> w i t h attached deck , subsurface sewage disposal system , <br /> private well and water service at 91 Edgewater Roach . <br /> ,john Slavinsky Presenting with Mr . Blakeman . George Green <br /> Jr . s to 'piled down . Abutter #■W i i ✓a iV was Provided . <br /> Mr . Slavinsky stated t is a very small house , as close t <br /> the street as zoning will allow . They are incorporating <br /> system of drywells . The septic has been approved with <br /> stipulations . Town water is available . Stake haybales are <br /> shown pervious driveway and parking- area . The house 1 s <br /> 26 x 3 ; deck i ' . They are not asking for cutting an <br /> filling near the embankment , except what is required for the <br /> foundation . <br /> Mr . Sherman stated it is as much setback as possible . He 's <br /> concerned with the steep slope and has reservations about the <br /> well ; he would like to see it moved . St ked haybales and <br /> silt screen are not sufficient . They will have to have <br /> something in the ground , like an angle iron . Mr . Slavinsky <br /> agreed <br /> Mr . Sherman asked if the well can be moved'? Mr . Slavinsky <br /> stated with a letter from the Commission to the Board o <br /> Health requesting 'it; t hey have a requirement o 5o feet . <br /> Mr . Sherman ked whet kind of rig would e used to drill the <br /> wet <br /> Mr . ke n staters it will have to be done by hand , or in could <br /> the winter time . Mr . Sherman stated if hand done , it <br /> e put down there ( pointing ) . The hearing could be closed <br /> upon he and Mr . Slavinsky coming up with reinforcement for <br /> the haybale line . Mr . Slavinsky agreed some kind of metal <br /> would e appropriate every 8 feet . <br /> Mr .. esros ers stated the water service line shout.d be cone <br /> y hand and rather quickly . Th-is should be included in the <br /> narrative . i rr . Slavinsky agreed to those conditions . <br /> Ms L nni k expressed concern with the re e et tion . Mr . <br /> Sherman stated there would be the usual conditions that <br /> wi thy,n the work unit any trees to e preserved will e <br /> boarded off andbeyond the work limit w l be a naturally <br /> vegetated u err strip . Also because of the steep slope , <br /> once the water line is dug , straw and netting would have to <br /> e put down over it immediately . r . Slavinsky h _d no <br /> problem with that . <br /> Mr . itzsion ons questioned nitrogen loading . Mr . Sherman <br /> stated it is a factor . It is greater than a 1-4slope . <br />
The URL can be used to link to this page
Your browser does not support the video tag.