Laserfiche WebLink
Mr. Sherman stated he will call DEP tomorrow and see if they <br /> will allow multiple filings under one RBA; the Commission <br /> would be willing to do so. <br /> Mr. Lo fchie stated in the future, if the Water district is <br /> going to do a project, somewhere along the way there should <br /> b something proviLded to the homeowner that they have to <br /> check with the Commission to see if they have to filo <br /> Mr* Baker advised the Mashpee Neck letter will go out in <br /> approximately two weeks; service connections are being done <br /> now. <br /> Mrs. Ferriday suggested an earlier letter to put in their <br /> initial packet and asked if they would do this? Mr. Baker <br /> would have no objection as long as it does not raise the cost <br /> of the postage above .2 . <br /> The Agent will write a generic letter and call DBP tomorrow. <br /> He will review the issue of Mashpee Deck. <br /> An enforcement letter to be sent to Tiffany. A letter to be <br /> included that the Commission wants them to be aware that in <br /> many cases they will have project that should he coming <br /> before the Commission* <br /> The Agent suggested closing Radcliff iff load and conditioni <br />