My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/12/1995 CONSERVATION COMMISSION Minutes
>
10/12/1995 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 5:05:03 PM
Creation date
2/23/2018 1:54:09 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
10/12/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 October 1995 <br /> Page 3 . <br /> prevent hre edge of the road r om eroding . <br /> Mr . Hayes advised there is a swale that takes emergency ancy sfor <br /> ester run-off nd it cuts right into the bank; there are two <br /> of them . <br /> Mr . Sherr stated with almost all Orders of Conditions , <br /> pre-work on-s to is required . hie would like o arrange '. <br /> for a day when it . Green nd Mr . Desrosiers are available . <br /> The on-site o f l l o nor changes . <br /> Mr . Rosen er s ked where hre brook goes and Mr . Gree <br /> advised i r u�ns o o Gr e i ver ; i <br /> cores from Witches <br /> hres <br /> Pond nd Fells Pond . It is Abigail 's Brook and cores under <br /> the dirt road that begins Monomoscoy . <br /> Mr . Chapman r felt what s proposed is the best approach . i <br /> the Commission feels strongly , there are many other things <br /> that can be done . <br /> Mr . Sherman s ted none of the Commission has had a chance o <br /> o out with a plan in hand to look at the site and fine-tune <br /> things . <br /> Mr . Chapman had no problem with that . All of the catch <br /> basins are i n; he did not locate them but did put Paint on <br /> the roadway whrere the waterways and leach i is will be <br /> located . . <br /> Mr . e s r M 4I 1 advised is marked out 1 1 woods . . <br /> Sherman stated the structures are not marked . He would like <br /> to be able to see where the paved waterways are to the <br /> wetland . He would 1 1 ke to go out into the field with Mr . <br /> Green an r Desrosiers to have a look . <br /> Mr . Desrosiers was comfortable with that one . Whats <br /> proposed is to remove loam to get filtration into the soil . <br /> There would only be an overflow problem if he put the r 'ip- <br /> rap in to break the sheetflow . Mr . Chapman stated there are <br /> cinder oo ks that have fallen into hre area . There nay be <br /> little hand work pulling out the blocks . The brook has <br /> very defined channel . <br /> Mr . knee 1 n asked when the meeting could be held . <br /> r . Rosenberg q es loned if the bike lanes are i n the sane <br /> place s the catch basins r . Chapman stated the catch <br /> basins are In -the bike lanes; they are proposing checkerboard <br /> grates . Pyr . Rosen e r s ked � hoer �. no ea r .�. <br /> between .the bike lane and the road-? There s none ; they are <br /> defined by a Painted 116ne on both sides o hre road . <br />
The URL can be used to link to this page
Your browser does not support the video tag.