Laserfiche WebLink
2 Novembor 1995 <br /> Page 3. <br /> sin. The newer basin will have more capacity . It will <br /> have to be cleaned re lrly <br /> Public co ment r none . <br /> VOTE: Motion made and seconded to find a negative <br /> determination . Unanimous Vote . <br /> NEGATIVE DETERMINATION. <br /> 2 _ PETER J . PANDOLFIN09 213 Wheeler Road , continued from <br /> October 1995 . No one appeared for this - hearing . <br /> Mr . Sherman stated t a's was being continuedfor preparation <br /> of an additional plan with grade changes necessary . Mr . <br /> P ndolfi no called to ask if his builder sent in the plan but <br /> he had not . He suggested giving a them a month , with the <br /> applicant 's consent , or a positive determination i t be <br /> issued requiring a Notice of Intent . <br /> VOTE: Motion made and seconded to continue to December 14 ,, <br /> 1995 at 7 :25 p .m . with the consent of the applicant . <br /> If the applicant does not concur , a positive M/ r-m n tion will .issued requiring c Notice of Intent . <br /> CONTINUED To 14 DECEMBER 1995 - :25 P,M. <br /> :30 FELIX BOSSHARDo 130 Pimlico Pond Road , Continued from <br /> 5 October 1995 . Mario DiGregorio and Roger McNevish <br /> presenting <br /> Mr . Sherman stated they had a Previous hearing and on-site <br /> inspection d found anomalies that needed addressing . Ther <br /> were extra paths down the steep slope . Also , after-the-fact <br /> fees are owed . Some of the revetment had been put in . <br /> Mr . DiGregorio stated the Amended Notice of Intent addresses <br /> the amended site plan . 1 revised narrative was provided and <br /> abutters notice al so . <br /> The home was built in 1991 and Mr . Bosshard has been <br /> Onibblingil away in the 50 foot buffer zone . They have <br /> located some of the ancillary paths down to the water , one to <br /> canoe landing and one leading to the floating dock and <br /> elevated staircase . They have tried to show the network o <br /> small paths that will not exceed 160 linear feet . other <br /> paths not shown will be rttd with indigenous species . <br /> The major project is stabilization of the steep slope to <br /> Wakeby Pond . There is a lot of bank undercuttingtong the <br /> shoreline . o f of fear of losing the elevated st i t case 5 <br /> they put in 30 linear feet of stone work this Spr"i n . They <br /> would like to put 'in 50 more . The BVW is leaning into the <br /> water and the bank is being undercut by wave action . <br />