My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/2/1995 CONSERVATION COMMISSION Minutes
>
11/2/1995 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 5:08:38 PM
Creation date
2/23/2018 1:55:35 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/02/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 November 1995 <br /> Page 4 . <br /> There is a floating dock with Jot floats which wobbles In the <br /> water . The square footage has been increased by 215 s .f . and <br /> they are asking for 8 pipepiles o stabilize the structure . <br /> Beneath the elevated stairs , here has leen erosion . Timber <br /> tie retaining stairs are proposed for further erosion <br /> control . <br /> Mr . Green asked if they are moving the wall,-?, <br /> Mr . McNevish referred to a cross section shown on the plan <br /> for stabilization the edge of the pond where there is no <br /> vegetation . The height varies from o 1-1/2 ' . Because <br /> small stone was used , they would like to stay with that <br /> concept . They w1 l l try to get. filter fabric behind the rip- <br /> 'rap . ip- <br /> r p . <br /> Mr . Sharpe asked the total below the l eva t o n Mr . <br /> . <br /> McNeilish stated lot-is a vertical face . Mr . Sharpe asked <br /> to the lefty The total volume is 40 c .f . , r . McNevish <br /> stated when this goes two the State , they will want that <br /> calculation . It is that one stone , for that small area . <br /> Concerning foot path stabilization , he stated there are many <br /> tiers which' will preclude erosion . <br /> Mr . Green asked if they were laying this up dry? They are <br /> Mr . DiGregorio stated shown is 23 <br /> um up on the bank . <br /> They will only e in areas not vegetated; there will be no <br /> alteration o the BVW . The stone s there to protect . <br /> Mr . Sherman would have to ee with t.he person doing the <br /> stone work; they cannot out down the BIW . <br /> Mr . I esr os i er s asked how the stone will be brought i Mr . <br /> a.Grr e or i o stated there 's a path they can use to get the <br /> stone i nd then i d l be r eregeed <br /> Mr . esrrosierrs asked what will happen when this fails , arra it <br /> will Mr . h o e i s h stated will need maintenance and <br /> inspections oyer time . <br /> Mr .. [ esr os i er s stated they have been going to a different <br /> type of construction on Mas tepee/lea# ey . He cited he <br /> irr ser s project . <br /> Mr . DiGregorio stated ice may disperse some of this stone but <br /> they feel this is the most unobtrusive method . The spaces in <br /> stone will dispel save sediment . This is a semi-soft <br /> approach . <br /> Mr . Fitzsimmons suggested gabions . Mr . Sherman stated ice <br />
The URL can be used to link to this page
Your browser does not support the video tag.