My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/8/1996 CONSERVATION COMMISSION Minutes
>
2/8/1996 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 5:15:43 PM
Creation date
2/23/2018 2:02:38 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/08/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Febnary 1996 <br /> Page 7. <br /> VOTE: Motion made and seconded to accept the proposed method of beach nourishment <br /> as agreed upon. Unanimous Vote. <br /> RDA FORM: A form with the new language added concerning notification. and <br /> inspection of work upon completion. <br /> MACC SURVEY; The bier zone project survey was distributed - to be reed by <br /> February 15. The Agent requested that the fonm for the Annual Meed be turned in this <br /> evening. <br /> AUE: Copies of the Agent's response to allegations made by Mrs. Laure were <br /> distributed. He stated he nearer told her it is not a wetland. it is unfortunate it happened a <br /> it creates a situation where they are anger. An enforcement order was issued allowing <br /> them to continue working on the house but they had to remove the slash and Mbilize the <br /> slope which was eroding into the wetland and they will have to proide a long term plan for <br /> tabflization of that slope. He wiff sit down with BM Hauck to make sure it will not happen <br /> agam. From now on, in the field, he will fiU out a form that will be signed by whomever <br /> he is meeting with. . <br /> no <br /> lr, Sherman advised he was with Brian Zeppenfeld in the area a month later and Brian <br /> remembers him telling him here was a wetland problem on the lot. 'The ratter may be <br /> under control as a long time friend of his is a friend of theirs. The very last page of the <br /> response hsts things that must be done. He will pot the Lues in touch with the County <br /> Extension Bernice. Lae asked for another two weeks and then they will come before <br /> the commission. When they come in they will have to agree to even4hing discussed. <br /> 11r. Desrosiers spoke to the $4,000 cost and stated if they remove the slash themselves, it <br /> would not be that cosh. <br /> Shen .an stated the pipe is blatantly illegal. Bob Raymond was in whose company <br /> prepared the plan; it is not a situation that any engineer could miss. 1t is a very deep kettle <br /> hole. <br /> The Chahman asked if the Executive Secretary asked hirn to respond to the allegations` <br /> �&. Sherman armed if this was conning up at the Selectmen's' meeting and was told by <br /> Joke Mason that it was not, however, it did. Judy M& and Nancy Caff-yn asked that he <br /> respond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.