Laserfiche WebLink
2 February 1996 <br /> 'age 1 . <br /> equipment on and to `-load material onto the beach below and revegetatin of the buffer <br /> zone at Triton Circle. Norman des presenting. Abutter notification receipts were <br /> provided. her are looking for authofization to use 15 feet of right-of-way corning in off <br /> Triton sound to bring construction vehicles down to the top of the coastal bank. This is <br /> for a staging area. <br /> �. Sherman asked if New S B ury Green Nominee Trust is in agreemenV. W. Mayes <br /> has subnnitted letter to the abuttm and Chris Burden stated he wdl give a letter o <br /> pei <br /> rrfisson. The area wdl be repaired and restored. Both abu ers have no problem with <br /> the project <br /> Johansen stated there is old information in the ung and it is mixed up, not in order. <br /> Public comments:none. <br /> VO pion made and seconded to close subject to rept of a letter faro Chis <br /> Burden, DEP number and verification of item. Unanimous Vote. <br /> CLOSED PENDING. <br /> 9:00 RANDY BERN for construction of a single family residence, including driveway <br /> and septic system at 10 Wheelhouse bane, Beth Aronson presenting. A continuance was <br /> requested. <br /> 1W. Green asked for the Agent's comments why this was being continued <br /> 1&. Sherman meted the issues and stated they are bfinging in a botanist at the <br /> Comndssion's request. <br /> fir. Johansen advi <br />