My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/2/1996 CONSERVATION COMMISSION Minutes
>
5/2/1996 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 5:20:12 PM
Creation date
2/23/2018 2:05:32 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
05/02/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> 2 May 1996 <br /> Page 6. <br /> fir. S via stated he wants to get another opinion, fir. Shem an asked to be not ied who <br /> the person is. <br /> VOTE: Motion made and seconded to continue to May 30, 1996 at 7:40 at the request <br /> of the applicant to consider new plans in terms of coastal bark delineations, to <br /> receive another report on calculations on the two wetland areas. The salt marsh <br /> will have to be delineated at a Later time. Unanimous Vote. <br /> CONTENUED TO MAY 30, 1996 - 7:40 P.Q. I. AT TBE REQUEST OF THE <br /> APPLICANT. <br /> 7:50 CAST PHER FOSS for a De tion of Applicability on proposed <br /> installation of 70 feet of stockade fencing at 417 Mononnoscoy Road. <br /> A& Sherman stated there are no wetland cont ms, no performance standards. <br /> Public comments: none. <br /> VOTE: Motion made and seconded to find a negative de tion. Unanimous Vote. <br /> NEGATIVE DETERMINATION. <br /> 7:55 i AS PEE WATER DISTRICT to construct a 12 inch water main in the 100 foot <br /> buffer zone of Quinaquisset Avenue. Daw Rich presenting. By petition, they will. be <br /> instaft water main from the entrance to willow Bend down Quinaquisset to the Cotuit <br /> line taking in side street up to the Cotuit Bay Condos. They are starting 150 feet east of <br /> Willow Bend. The line is in to willow fend. There are two meas of wetland that have <br /> been delineated, one is coastal bank. The water main will be on the south side. <br /> �. Shernnan stated it is not a challenge to the Commission, wi <br />
The URL can be used to link to this page
Your browser does not support the video tag.