Laserfiche WebLink
14 November 1996 <br /> Page 3. <br /> Mr. Sherman stated if it is a neer dock, the Commission should still require ars <br /> engineered plan with water depths but in this case this is available on an old <br /> plan. <br /> Mr. ] esrosiers stated if it is insligni ca t, he is in favor of helping the <br /> applicant out. <br /> Mr. Fitzsimmons was in favor o M* iM ng cost to the applicant. <br /> VOTE: Motion made and seconded to continue the hearing to 5 December <br /> 1996 at the request of the applicant. <br /> CONTINUED TO 5 DECEMBER 1996 AT 7:40 P.M, AT THE REQUEST <br /> OF THE .APPLICANT. <br /> 7:40 NEW SEABURY PENINSULA COUNCIL for work supplemental to <br /> the installation of a catch basin at Rock Landing Road and Reserve Area K- . <br /> Michael Grotzke presenting. Abutter notification receipts provided. This is in <br /> response to two areas of work permitted where work departed from the work <br /> approved. A catch basin was installed near the Real Estate fond. They <br /> replaced the pipe and shortened. it. They put in silt fences but the contractor <br /> put stone behind the silt fence and the Commission decided that would <br /> necessitate a Notice of Intent, <br /> Mr. Sherman stated it impacted a small section of Bev, <br /> Mr. Grotzke stated as water comes out of the pipe, velocity wiH be slowed. <br /> down. <br /> Mr. Sherman stated it makes sense and the hearing could be closed pending <br /> his site visit. <br /> Mr. Johansen stated the IEP number is missing and also the attestation o <br /> ownership form. <br /> Public comments: none, <br /> VOTE: Motion made and seconded to close pending receipt of DEP number, <br /> attestation of ownership and an on-site by the agent. <br /> Unanimous vote. <br /> CLOSED PENDING. <br />