My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/10/1996 WATERWAYS COMMISSION Minutes
>
9/10/1996 WATERWAYS COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 5:25:55 PM
Creation date
2/23/2018 2:37:03 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
WATERWAYS COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/10/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Dredge Shoestring Bay Winter 2001-2002 <br /> and Conduct Post Dredging Survey <br /> Future <br /> • Renew State and Federal permits for maintenance dredging Popponesset and. <br /> Waquoit Bays <br /> • Conduct Maintenance Dredging and Post dredging surveys as needed. <br /> This Future represents starting the on-going process of renewing state permits, <br /> which are only valid for 5 years, and the Army Corps of Engineers permit which is valid <br /> for 10 years. This activity will start in approximately 2002 when we will begin to repeat <br /> the cycle that we started in 1995. To support this activity, we propose a "revolving fund" <br /> approach described below. <br /> Funding <br /> To fund this effort, we envision using the newly established fund for mooring fees <br /> to accumulate money for dredging purposes. We also propose that fine money from <br /> waterways infractions, money from public donations, and waterways improvement funds <br /> be used as they become available to defray the costs. For Phase I sediment sampling, it <br /> seems appropriate to also request some of the money the Planning Board has in it's <br /> Windchime Condominium study account. We would like to arrange things so that we <br /> minimize borrowing and don't start out in the red. <br /> osts <br /> • Waquoit Bay and Popponesset Bay Maintenance Dredging and Post Dredging <br /> Survey $95,000 in 1997. <br /> • Phase I - Feasibility Analysis and Data gathering. The total scope of the <br /> permitting process can range from$118,000 to $250,000 depending on the <br /> approach. By breaking it up into increments, we can change the scope of the <br /> effort to match our needs as we determine them. Right now, we have a wide <br /> range of alternatives and very little factual data with which to narrow down the <br /> options. <br /> We therefore propose a Phase.I budget of: $85,000 in 1997 <br /> • Phase II - Gather rest of data and obtain permits $TBD ({$100,000? 1998 <br /> $TBD ((<$100,000? 1999 <br /> • Phase III - Dredging and Post Dredging Surveys $TBD <br /> si <br /> iE <br /> i <br /> E <br /> 1 <br /> I�I <br /> E. <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.