Laserfiche WebLink
swartzbaugh and input from Brian Howes has put together a <br /> draft brochure, which talks about what the dredging effort <br /> will be , Jim announced that there will be a, briefing to <br /> the selectmen on 25 September in which. Brian Howes will <br /> present the status of the water quality project, and we <br /> want to give them an update briefing about the dredging <br /> permit status, Tim led the commission in going over the <br /> draft of the brochure in a comprehensive step--b --step <br /> manner. <br /> There was a lengthy discussion on the subject of haw far up <br /> the Mash.pee River we were going to request to be dredged. <br /> It was the general consensus that the commission should <br /> request the dredging permits for the original area . This <br /> was comprehensively discussed by the commission and <br /> etensi-rely researched by the Woods Hole Group. <br /> Jerry Daly made a motion to go forward with step two of the <br /> Woods Hole Mashpee River Dredging Project contract, Bill Taylor <br /> seconded the motion and all other members Voted in favor. The <br /> motion was carried.. <br /> Harbormaster Report -- Perry Ellis <br /> rhe usual problems have still been present regarding personal <br /> watercraft and boating traffic when the weather was good, <br /> especa-ally in the area, of Popponesset Bay. other than that, <br /> there have been no major problems . There have been 25 more <br /> applications for moorings along with two to three phone calls <br /> per day as well as wally ins inquiring as to the mooring waiting <br /> list status . <br /> Barnstable County Coastal Resources Committee Update {...., <br /> Gerald Daly <br /> There has not been a meeting to report on as of this date, <br /> The next scheduled meeting is on September 25th. <br /> TEW BUSMSS <br /> Correspondence <br /> 'tconung: <br />