My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/05/2000 WATERWAYS COMMISSION Minutes
>
09/05/2000 WATERWAYS COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2018 5:35:54 PM
Creation date
2/26/2018 1:36:38 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
WATERWAYS COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/05/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
swartzbaugh and input from Brian Howes has put together a <br /> draft brochure, which talks about what the dredging effort <br /> will be , Jim announced that there will be a, briefing to <br /> the selectmen on 25 September in which. Brian Howes will <br /> present the status of the water quality project, and we <br /> want to give them an update briefing about the dredging <br /> permit status, Tim led the commission in going over the <br /> draft of the brochure in a comprehensive step--b --step <br /> manner. <br /> There was a lengthy discussion on the subject of haw far up <br /> the Mash.pee River we were going to request to be dredged. <br /> It was the general consensus that the commission should <br /> request the dredging permits for the original area . This <br /> was comprehensively discussed by the commission and <br /> etensi-rely researched by the Woods Hole Group. <br /> Jerry Daly made a motion to go forward with step two of the <br /> Woods Hole Mashpee River Dredging Project contract, Bill Taylor <br /> seconded the motion and all other members Voted in favor. The <br /> motion was carried.. <br /> Harbormaster Report -- Perry Ellis <br /> rhe usual problems have still been present regarding personal <br /> watercraft and boating traffic when the weather was good, <br /> especa-ally in the area, of Popponesset Bay. other than that, <br /> there have been no major problems . There have been 25 more <br /> applications for moorings along with two to three phone calls <br /> per day as well as wally ins inquiring as to the mooring waiting <br /> list status . <br /> Barnstable County Coastal Resources Committee Update {...., <br /> Gerald Daly <br /> There has not been a meeting to report on as of this date, <br /> The next scheduled meeting is on September 25th. <br /> TEW BUSMSS <br /> Correspondence <br /> 'tconung: <br />
The URL can be used to link to this page
Your browser does not support the video tag.