Laserfiche WebLink
I <br /> t <br /> 20 February 1997 <br /> Page 2. <br /> Mr. Roche stated there is a wall a couple of houses over that they intended to <br /> tie into and he would prefer to stick to the original plan. <br /> 11r. Sherman stated that gentleman has been altering the beach and if it i <br /> not done there will he serious scouring. He offered to request that the coastal <br /> geologist for CZM vomit the site, at no cost. <br /> Mr. Roche stated they would lose 50% of the leach area with gabions. <br /> Nlr. Sherman stated filer rolls last approximately 10 years. He suggested <br /> getting an independent opinion from someone else. Mr. Roche agreed. <br /> Mr. Noche asked if the geologist cones down and determines there may be <br /> sign scant scouring, what are his options? <br /> Mr. Fitzsimmons stated she has had a lot-of ideas on coastal hanks in the <br /> past. <br /> Public comment: none. <br /> VOTE: Motion made and seconded to continue to 3 Aril 1997 at 7:40 p.m. <br /> at the request of the applicant. Unanimous Vote. <br /> CONTINUED TO 3 APRIL 1997 AT 7:30 P.M. <br /> +7:40 K ISTIE COLLINS, 8 Great River Road, Continued from 232 January <br /> 1997. N r. Roche presenting. The same issues apply. <br /> Public comments: none. <br /> VOTE: Motion made and seconded to continue to 3 April 1997 at :40 p.m. at <br /> the request of the applicant. <br /> CONTINUED TO 3 APRIL 1997 AT :40 P.M. <br /> 7;50 GAIL ROBINSON to construct, license and maintain a proposed pier, <br /> ramp and Boat along the shore of Poppouesset Creek at II Bowsprit Point. <br /> Dave Sanicki presenting. Abutter receipts were provided. There are two <br /> e is in docks on either side. a w� he with feet of his abutter and a <br /> letter was obtained from 1�1r. evereau stating he has o profi ler with this. <br /> They are going up the center of the property. and trig to center the float <br /> between the two existing. lie only needs a variance on one sande. <br />