My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/12/1997 CONSERVATION COMMISSION Minutes
>
6/12/1997 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2018 5:28:26 PM
Creation date
2/26/2018 1:52:44 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
06/12/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
12 June 1997 <br /> Page 10. <br /> Ms Miller stated if they rerouted run-off to tete front, they could eliminate downspouts on <br /> the water side. <br /> Asked if there would be a problem with additional grading I&. Sherman stated if it does <br /> not increase run-off over the bank, the concept would not be a problem. It that 's a <br /> possibility, he felt the heafing should be continued to tie everything up. <br /> The Chinnan suggested details be worked out with the agent. <br /> Dr. Shammash expressed concern with the closeness. lir. 'itsions told hirer to take <br /> this up with Board of Appeals. <br /> i <br /> OT : Motion rade and seconded to continue the hearing at the request of the applicant <br /> to 14 August 1997 at 730 p.m. Unanimous Vote. <br /> CONTINUED To 14 AUGUST 1997 AT 7:30 PAL <br /> 8:30 ROBERT BORTOLOTTI for a Detenrination of Applicability on the proposed <br /> upgrade of an existing wiled septic system at 38 Fiddler's Crab Lane. fir. B ortolotti <br /> presenting. <br /> Mr. Shermm stated he was at the site today with Lynn Hamblin. The problem is due to <br /> the process, which is being corrected. No blame was directed at anyone. This a septic <br /> upgrade and an emergency certificate was issued. The problem is to make sure the lawn <br /> work corresponds to our standards. This was not included in the language of the RDA. 1f <br /> n agreement can be reached on the standards and how to reconfigure the lawn and also <br /> the annualreporting that i require, the Conussion could proceed. A policy was created <br /> tonight that in the future there would have to be a pre.-work ori-site for any emergency and <br /> thj.s would not have happened. The septic alone would be a negative determination. <br /> Ms Giblin stated it was A lawnoriginally, nogg was indigenous. The ntnunr <br /> distance to the beam is 10 feet which gives a buffer. She stated she talked to Bill Clark <br /> about the " of loam and he ad i.sed 4" was satisfactory. The additional cost does not give <br /> equal benefit. <br /> Mr. Sherman staffed the Comnussion cannot change in midstream tonight. <br /> Ms Hamblim stated they are not going to have a golf coupe lawn; it is a seasonal hone. <br /> I&. Sherman stated the issue is there is not 611, here is 4", a discrepancy from the pohc . <br /> Normally there would be a landscaper with a fertilizer report. NU Hamblin Mated the <br /> owner is reluctant to hire a landscaper. <br />
The URL can be used to link to this page
Your browser does not support the video tag.