Laserfiche WebLink
16 April 1998 <br /> Page 1 . <br /> Mr. Sherman advised the stakes for the bank were numbered in the field but <br /> not on the plan, He will need to verify staking. He stated the work it can <br /> e brought up another 1 - 15 feet. Mr. Slavinsky agreed. <br /> Publi <br />