Laserfiche WebLink
1 <br /> 17 September 1998 <br /> Page 5. <br /> Ms Hamlyn stated she believed the V-zone is seaward of the wad. Mr. <br /> Sherman stated it is std subject to storm waves and should be swn on the <br /> plan. He asked if they 4ad considered any other alternatives to a vertical <br /> wall, such as nourishment? <br /> Ms Hamlyn stated she taped to CZM about many alternatives, some <br /> extreme. In the letter Mr. Sherman had given to Mr. Wagner it runs the <br /> gamut from remove the house, put it up on p. . gs, those are really extreme <br /> mitigation to try to hold what has been there since 1954. This system is very <br /> stable and if you look down the shone line, there are vertical walls all the way <br /> down as far as you can see. Mr. Sherman stated that does not mean that it <br /> was a good idea, that was the custom. <br /> FIs Hamlyn stated CZM thought it was very practical to simply maintain and <br /> they did not have a problem With the extension. She would not object to Mr. <br /> Sherman tak ing with then and she would be wiffing to meet out there with <br /> thein. Mr. Sherman suggested continuing until he can get the benefit of <br /> their input. She agreed and wiU make the revisions to the plan. She <br /> suggested doing an alternative on the extension.. <br /> Mr. Wirsen asked how far the wan is from the foundation? Mr. Sherman <br /> stated 2 - 2-1/2 feet. Mr. Wirsen asked if this wad was gone, wouldn't it <br /> affect the V-zone? Mr. Sherman stated yes, but the trouble is the more <br /> seaward it is, there would be more opportunity for scour there; it would be <br /> affected by a inhnal storm.. <br /> Public comment: none. <br /> VOTE: Motion made and seconded to continue the hearing at the request of <br /> the applicant to 15 October 1998 at 7:40 p.m. to get input from CZM <br /> and a revised plan to show the dune delineation, UnanJmous Vote. <br /> BRING CONTINUED, <br /> 7:50 WILLOWBEND DEVELOPMENT CORP. , 49 Shoestring Bay Road, <br /> continued from 6 August 1998. .Peggy Fantozzi presenting with Tack <br /> Mc lhaney. Ms Fantozzi advised she was in the field with Mr. Sherman. <br /> The plans reflect survey information. The setback from the BVW is 138 feet. <br /> The building envelope was moved forward to the street. The setback from <br /> the top of bank is more than 75 feet. <br /> i <br />