Laserfiche WebLink
Mr. Sherman stated he hasn't had a chance to verify the wetland line. Mr. Sherman said they have never <br /> set a precedence of going less than 35'. Mr. Saniel l mentioned that they are filed with the Board of <br /> Appeals for a variance setback for the street. That is still pending. <br /> Mr. Sherman said all practical experience tells us he will never keep that 3 5'because people will always <br /> want access for maintenance around the front of the hese. Mr. Sherman went on to say that the furthest <br /> they have ever gone down to is a true 3 5"to work limit. He would not hke to break the precedent of doing <br /> n flmtt <br /> Mr. Green said the only problem he had with that is we are looking at a denial. Mr. Sherman pointed out <br /> that we needed to gain 'or 5'. Mr. Sardcki thought the Board had re-vegetated back into the work limit. <br /> Mr. Sherman explained to get a true 50 ,we have done that. We have not done it with a 3 5'. Mr. Sherman <br /> said he doesn't want to take everything we have done for the past four years and go down to 3 "instead of <br /> 35' without giving it some thought <br /> Mr. Sherman said he would like to verify the wetland line. He recornmcnded that the hearing be continued <br /> for two weeps. If it is a conservative line,we mi <br />