Laserfiche WebLink
May 1999 <br /> Page 7. <br /> Mr. Sherman stated this needs-Board of Appeals. The proposed deck is in a <br /> disturbed area but must meet ACEC standards and would need a variance. <br /> He spoke with Mrs. McCormack today and she was receptive to putting in <br /> some screening plants. He advised he would be willing to give a positive note <br /> to the Board of Appeals. The other issue is the Jacuzzi was not in the <br /> verbiage so the project will have to be readvertised and abutters renotified. <br /> Mr. Grotzke agreed. <br /> Public comment: none. <br /> VOTE: Motion made and seconded to continue the hearing to 1 July 1999 at <br /> 7:40 p.m. at the request of the applicant. Unanimous Vote. <br /> HEARING CONTINUED. <br /> 7:40 FAI IDOON KHAN for proposed lawn and landscape changes at 1 <br /> Glenneagle Drive. Michael Grotzke presenting: sod was removed under a <br /> prior application. They are proposing to sod the area in the dotted area and <br /> plant the bark mulch area with a. native grass mix. The amount of lawn is <br /> 10%. <br /> Public comment: none. <br /> VOTE: Motion made and seconded to close pending IEP number. <br /> Un nil ous Vote. <br /> CLOSE PENDING. <br /> 7:45 MEDIA ONE, TING, for a Determination of Applicability on the <br /> proposed installation of subsurface cable conduits along a portion of Route <br /> 151 with an estimated total distance ofwork within the buffer zone to a <br /> wetland resource area of approximately 2200 feet. Brad 1 laillot of Coastal <br /> Engineering represented Media one. since filed, he met with the Agent on <br /> site to discuss sequencing. They propose to install 3 PVC cables northerly <br /> from 1000" crest of the Rotary. There are several wetlands along the way. It <br /> will be backfilled the same day. They will use jute netting and straw. The <br /> trench will be 18" wide. <br /> Mr. Sherman was not very concerned with any erosion. Language can be <br /> added that there will be a meeting at the small wetland near ino's before <br /> work is done to agree on erosion control. <br />