My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/20/1999 CONSERVATION COMMISSION Minutes
>
5/20/1999 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2018 5:26:00 PM
Creation date
2/26/2018 2:48:39 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
05/20/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
20 May 1999 <br /> Page 20. <br /> Quashnet Bag Gates: A public hearing to be held on this on 3 Tune 1999 at <br /> : o p. . <br /> Quashnet Bogs: A joint memo from Bill Fisher and Bob Sherman was <br /> reviewed with a list of things to be resolved. <br /> Sand Pit: Where are two new entrances. Jacobs is going to block off <br /> these areas with concrete blocks. They want to start the permitting on the <br /> creation of the new bog area and want to use the sand pit area for the <br /> disposal of the sand. Diane Bortos came up with an interim report. A large <br /> area is being used as a wildlife corridor. Filling a small part is appropriate. <br /> Mr. Sherman did not think they can do what they want to do. They want to <br /> truck It off the site but were told it is town property and they cannot do that. <br /> They floated out ideas ofcost which he did not believe. Bill Fisher thought it <br /> was a precursor to a renege. A delay is necessary but 1n the letter they are <br /> asking for more time. work to be completed no later than 1 October. He felt <br /> the Commission should go along with it. <br /> Mr. Wollenhaupt stated there is plenty of water coming out of that treatment <br /> system. it is not our problem they took out the uplands. <br /> Mr. Sherman asked if we should-hold their feet to the fire and say it has to be <br /> done by 1 June? <br /> Mr. Wollenhaupt stated planting in June would not be bad. <br /> VOTE: Motion made and seconded to go along with the request for upland <br /> compensatory revegetation delay. Unanimous Vote. <br /> Mr. Sherman advised they are pressing to do the bog expansion. A decision . <br /> will have to be reached in the next few months. The Bog Subcommittee <br /> should hold its own meeting on this. <br /> Mr. Wollenhaupt asked when they will put the pines back for the brook <br /> trout'? Mr. Sherman stated that is high priority. <br /> Mr. Fitzsimmons asked what is Handy's problem with the contract, Mr. <br /> Johansen advised he feels he is responsible for everything. <br />
The URL can be used to link to this page
Your browser does not support the video tag.