Laserfiche WebLink
17 June 1999 <br /> Page 11. <br /> Coastal wetland Resource Delineation: The Agent advised there willl b <br /> workshop 9/24199. The cost is $85. He requested permission to attend. <br /> Permission granted. <br /> EPA; fleeting on 6122/99. Agent to attend. <br /> Pru-1x: The agent advised the structure may qualify for a 10A float. It <br /> would have to travel over a considerable amount of marsh and will need <br /> walkway. If a plan locates it accurately and it meet the building code, i <br /> would be acceptable. They will need a letter from the owner of the property. <br /> Mr. Ellis advised he is getting a mooring in the meantime. <br /> Reorganization: Next agenda. i <br /> Indian Museum: Dan Barnett and lion Li tack manned shovels on <br /> Tuesday. Project moving along. <br /> Quashnet Bogs; There was an article in the Cape Cod Times. The Agent <br /> read from the article. He felt the tissues should be clarified. Mr. Rosenberg is <br /> to write a letter, addressing it to Nancy Balkus. <br /> Berms: Kk6 is not stable because of the failure. <br /> Plantings: Pine trees to be planted on the berm tomorrow. <br /> Ocean Spray: No word from them concerning long terra plans. <br /> Mr. Johansen advised he got a call the other day from Brian Mandy who was <br /> upset about the article in the Times. Brian wants a fence put up at the <br /> Farley Bog. <br /> Mr. Johansen stated if they are going to build another bog,g, key should look <br /> t the Childs River. <br /> It was agreed a special meeting should be held on the bogs. <br /> VOTE: Motion made and seconded to meet Tuesday, June 22, at +7:00 p.m. <br /> Memo: Memo from Diane Foretos was circulated for review. The Agent <br /> stated it was food for thought. <br />