Laserfiche WebLink
i <br /> 9 September 1999 <br /> Page 6. <br /> because they were being worked on. He asked what is the impetus for going <br /> inside the 50" <br /> Mr. Rosenberg stated they have more deck in here than the entire -house <br /> removed. Mr. Sherman stated that has a deleterious effect on wildlife. He <br /> suggested a continuance to allow them to come back with a different plan. <br /> Mr. sanicki stated the applicant suggested discontinuing the driveway and <br /> parking on both sides. They will maintain as on the ground and delete the <br /> deck.. <br /> The Chair stated-he would like a new plan. <br /> Mr. wirsen asked for clarificationn what they are proposing. Mr. Sani ki <br /> stated they would maintain the driveway in its existing status and delete the <br /> lower deck. <br /> Public comment: none. <br /> MOTE: Motion made and seconded to continue the hearing to 23 September <br /> 1999 at 8:25 p.m. Unanimous Vote. <br /> HEARING CONTINUED.' <br /> 7: ROBERT SUTHERLAND to construct and maintain a stairway, pier, <br /> ramp and float in Shoestring Bay at 42 Devon St. Dave sanicki requested a <br /> continuance. <br /> Mr. Sherman advised there were no numbered flags so he did not go out. <br /> There should be a $30 continuance fee. <br /> Public comment: none. <br /> VOTE: Motion made and seconded to continue the hearing at the request o <br /> the applicant to +7 October 1999 at 7:30 p.m. and require a $30 <br /> continuance fee. Unanimous-Vote. <br /> HEARING CONTINUED, <br /> 7:50 MICHAEL SCOLAVINO for a Determination of Applicability on the <br /> proposed Title V septic system upgrade at 79 Sconsett Island Road and town <br />