Laserfiche WebLink
25 May Zoo <br /> Page 3. <br /> Mr. Sherman was at an on-site for new construction and saw a new deck on <br /> this property. He met with the builder and the plan is satisfactory. He <br /> recommended negative pending a meeting tomorrow if satisfactory plantings <br /> they were told to do for mitigation are done. <br /> VOTE: Motion made and seconded to find negative. Unanimous vote. <br /> NEGATIVE DETERMINATION. <br /> 7:25 WILLIAM LEHRER, for a Determination ofApplicability on the <br /> proposed installation of an 8' x 1 ' pre-cut shed at 27 owy Bay Road. <br /> Ms. Bor tos recommended a negative 3 finding. <br /> VOTE: Motion made and seconded to find negative. Unanimous vote. <br /> NEGATIVE DETERMINATION. <br /> 7:30 THOMAS & BETTS CORP. for the installation of groundwater pump <br /> and treat remediation system to remove chlorinated volatile organic <br /> compounds from the groundwater aquifer at Quinaquisset Avenue. Bill <br /> Fragone of GZA Consultants was present.. He advised they have installed an <br /> extraction well to the west on Sampsons Mill Road. They will pump ground <br /> grater to cranberry bogs. They are coming within the resource area of the <br /> pond and cranberry bogs. He described the process. The water will be <br /> treated. There are no VOCs. They will be pumping 60 gallons per minute <br /> but may have to go up to 80. The existing system is pumping at 69. <br /> Generating the water will be a benefit as they will not be using santuit Pond. <br /> Public comment: none. <br /> Mr. Green asked the amount of draw-down? Mar. Fragone stated they did the <br /> calcs for ME A4. It is Zoo feet away. Draw-down is 4-5 inches and is not <br /> significant. They looked at nearby wells. <br /> VOTE: Motion made and seconded to close the hearing and issue. <br /> Unanimous vote. <br /> HEARING CLOSED, <br /> e <br />