Laserfiche WebLink
September 2000 <br /> Page 6. <br /> The issue in the field is hove to verify where the application is to occur, <br /> by it is allied and hove we can validate where that application took <br /> place. <br /> We have agreed in principal.as to what the requirements are but need t <br /> work With the contractor so that vire have confidence that we are not <br /> applying something in the wrong location or too heavy a dose in a certain <br /> area. A lot oftime has gone into this n more details are needed in the <br /> Scope ofI Work. He can provide more comments when AFCEE givestheir <br /> presentation. . <br /> Spence smith stated they are wrung on a larger strategy for Ashumet <br /> Pond. The phosphorus is already there. They are looping for ars <br /> improvement in health and algae blooms production. Another ley <br /> element is monitoring. They want to do this very soon. if conditions are <br /> not right and there is a decision they will stop work and entertain ghat <br /> will be done in subsequent years. They are talking about work in the ' <br /> contour. If things do not go well in the Pilot Fest, they will stop and not <br /> do the full treatment. He showed a few of the monitoring stations during <br /> the program. They are planning ars injection ofalum sodium alumi ate <br /> mix. There trill be a 5 mere Pilot Test before they go to the full 28 acres. <br /> There will be intensive oversight and monitoring. Dr. Dare Mitchell i <br /> the primary decision maker. This is the ideal time to apply the alum but <br /> if the window closes, they are prepared to stop. They are looking at long- <br /> term effectiveness. They are ensuring there are proper safeguards. <br /> They will come in and discuss means and methods. 3 ' is the injection <br /> depth. A methyl mercury test will be done. They will be prepared to start <br /> work on the 25th. Steve Hurley will be at the boat ramp to inspect the <br /> equipment. Brian Bowes is ars independent party who is also doing <br /> monitoring. 'There will be follow up to see hoar well the treatment vent, <br /> one month after and into the next year. The other key issue discussed is <br /> protection of habitat. Natural Heritage has looped at the problem and <br /> has responded in writing. studies have shown that alum has little or n <br /> effect on the benthic community. <br /> Mr. Sherman stated he wanted to make it clear that Steve Hurley rust <br /> agree with this assessment. <br /> Mr. smith advised Dave Mitchell has written a letter that will be provided <br /> to- Steve Hurley for review with the conclusions about the condition of <br /> habitat.. Some of the problems with approaches in the hast were due to <br /> the poor design and lack of monitoring. They have the ley elements <br /> covered. <br />