My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/07/2000 CONSERVATION COMMISSION Minutes
>
09/07/2000 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2018 5:16:06 PM
Creation date
2/28/2018 12:53:20 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/07/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
v <br /> 7 September 2000 <br /> Page 7. <br /> Mr. Sherman stated it 'is a bit of a stretch to go forward and issue an <br /> order until we have the final scope of work but he is willing t <br /> recommend it for two reasons, first of all because a lot of w r1 has been <br /> done and it is known ghat has to be done between now and the pre- <br /> mobilization meeting and are in agreement on those fundamental things. <br /> .Secondly, we will have to condition, if the Commission chooses to go <br /> forward, to give the Commission, in the absence of some of the criteria <br /> being all worked out, the right to stop-work upon any event that is seen <br /> to be not going forward in' the interests of the Act. There will be a Preto <br /> poorer. <br /> The Chair stated it has to be very clear that if a. stop work is issued, it i <br /> not debatable, if any one of the three men, Bob Sherman, Bill Fisher or <br /> Stere Hurler raises any question. <br /> i <br /> Mr. Smith advised the contract people know that this project could be <br /> terminated at any point along that progression. He will see that the final <br /> Scope of Work will be to the torn by next Thursday in preparation for the <br /> pre-mobilization meeting. Bill Fisher suggested an approach for <br /> mapping where work has been clone and that will be nailed down. <br /> Mr. Fitzsimmons asked what sets this time schedule to be the onl3 <br /> appropriate one? Mr. Smith stated it happens in the summer, the pond <br /> heats up. In the winter it is one temperature throughout. As it heats u <br /> in the fair weather, it stratifies which structures the pond. That is what <br /> goes anoxic in the summer season. They are trying to hit it when that <br /> mass of phosphorus in the bottom of the pond reaches its maximum. <br /> . <br /> They want to do it before fall overturn when it goes back to mixed. <br /> Mr. osenbered homer long it could take to determine the <br /> g <br /> effectiveness of that pilot? Dr. Mitchell stated they are going to evaluate <br /> in 1-2 days to see if there are any fish impacts. Any visual effects can be <br />' seen immediately. They have submitted as part ofthe overall form a flow <br /> chart that indicates ghat they are using for. criterion. For the pH, <br /> anything below 6 and greater than 8 stops wort . The warning -threshold <br /> is at -12 and 7-12. <br /> Mr. Rosenberg asked if that could be determined within 24 hours? Dr. <br /> Mitchell stated it could. The effects of the treatment are the longer-range <br /> picture. His focus is to make sure it is a safe application. <br />
The URL can be used to link to this page
Your browser does not support the video tag.