My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/31/2000 CONSERVATION COMMISSION Minutes
>
08/31/2000 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2018 5:13:33 PM
Creation date
2/28/2018 12:54:36 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/31/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 August 2000 <br /> Page 3. <br /> Mr. Sherman stated it will be necessary to .meet one more time to address <br /> erosion behind the bulkhead. The salt marsh should be noted on the plan � <br /> and flagged in the field. <br /> Mr. Sani ki stated, with the exception ofthe proposed rjamp and float, these <br /> structures are existing. Mr. Sherman asked that he show the boundary f <br /> salt marsh and how the eroded area will be mitigated. Mr. Sanicki stated <br /> they will put a new bulkhead in front. Mr. Sherman requested more details. <br /> Mr. Sanickl stated this will need to be continued as it needs a special permit. <br /> Public comment: none. <br /> VOTE: notion made and seconded to'21 September 2000 at 7:55 p.m. <br /> t the request of the applicant, Unanimous Vote. <br /> HEARING CONTINUED, <br /> 7:20 CARL MACDONALD to construct a single-family residence, Title v <br /> septic system, utihty servIce, impervious driveway and deck at 165 Nest <br /> Way. V <br /> VOTE: Motion made and seconded to continue the heaving to 21 September <br /> 2000 at 7.45 p.m. at the request of the applicant. <br /> Unanimous vote. <br /> HEARING CONTINUED, <br /> +7:25 RODERICK ST. PIERRE on a request for Determination of <br /> Applicability for proposed site preparation for perk testing to include <br /> installation of up to four groundwater wells, dewatering area and percolation <br /> test area at 261, 265-269 Monomosco r Road. Norman Mayes presenting. <br /> Mr. Sherman asked if this was the Toni Smith site. Mr. Mayes stated no. <br /> vhen they do the dewatering, they will not use a backhoe, they will use a <br /> boring rig. Where will be four wells, 10' diameter, and will lower the water <br /> table 18". They will be 35' from the edge of the wetland. A dewatering basin <br /> ill go into the driveway. <br /> Mr. Sherman asked the square footage destroyed by the perc test? Will there <br /> be loss of natural vegetation? <br />
The URL can be used to link to this page
Your browser does not support the video tag.