Laserfiche WebLink
31 August 2000 <br /> Rage 4. <br /> Mr. Hayes stated there is a potential for-four trees to be taken down. The <br /> client will replace then. The narrative explains the mitigation. They have to <br /> either dig a hole and suck it out or put in ground water wells and pump the <br /> water onto the ground. <br /> Mr. Sherman stated it can be done with a slight change. We have no <br /> authority with pere tests. Dewatering is the height of absurdity. <br /> Ms Moore asked if the old pert test was 35' from the water? Mr: Hayes stated <br /> 42' from the edge of the BVW. <br /> *' <br /> Mr. wirsen stated they have to slow down the velocity of water, He asked if <br /> they were pumping 400 gpm The alternative is to dig a big hole. <br /> Mr. Hares stated they understand if this does not work, they have to <br /> revegetate the lot. <br /> Public comment: none. <br /> VOTE: Motion made and seconded to find negative. Unanimous vote. <br /> i <br /> NEGATIVE DETERMINATION. <br /> +7:30 CHILTON DEVELOPMENT INC. for the demolition of an existing <br /> d re ling, construction of a new three bedroom dwelling with septic system, <br /> pool, dive, utilities and associated landscaping and site work at 128 <br /> Waterway. <br /> VOTE; Motion made and seconded to continue the hearing to 21 September <br /> 2000 at :00 p.m. at the request of the applicant. Unanimous vote. <br /> HEARING CONTINUED. <br /> Elliot Rosenberg arrived at T37 p.m. <br /> 7:35 AFCEE9 Quashnet Bogs, continued from 17 August 2000. Mike Mnior <br /> was present. <br /> Mr. Sherman stated there was a very productive meeting today. They are <br /> clarifying the roles of the consultants, <br />