My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/31/2000 CONSERVATION COMMISSION Minutes
>
08/31/2000 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2018 5:13:33 PM
Creation date
2/28/2018 12:54:36 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/31/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
31 August 2000 <br /> Page 0. <br /> Mr. 1 Iinior stated he has not heard the results of sampling in the birds. <br /> Ms BOr tos could not find a lab t0 d0 testing for EDB. Mr. 1 Iinior stated h <br /> had provided a name.. Ms BOr tos stated they told her they could not d0 <br /> testing and it was not done. Preliminary testing showed the Heron was <br /> fairly healthy. The Owl was emaciated. <br /> Mr. Sherman advised Bill Fisher recommended that EPA be cross-referenced. <br /> Public comment: none. <br /> VO'T'E: Motion made and seconded to accept the amendment subject to the <br /> Agent meeting with Steve Furley. <br /> The Chair asked how they are getting On with the compensation agreement. <br /> He was told there will be a meeting on Wednesday at 1:00 p.m. Mr. Minior <br /> stated progress is being made. <br /> AMENDMENT ACCEPTED. <br /> 7:40 PETER K. MO AN, 76 Triton way, continued from 17 August 2000. <br /> Norman Hayes presenting. He referred back to the Original Order of <br /> Conditions and what was permitted. There is an eroding coastal bank. It <br /> has been repaired three times. This filing covers Moran, Florence and New <br /> seabury Corp and Mr. Moran has the permission of the Others. The vertical <br /> bulkhead was removed and the sheet piling has been completely removed. <br /> They have the Chapter 91 plan and the Corps plan. stones will be reused to <br /> the degree possible. They cannot replace this without temporary sheet piling. <br /> It will be the sane as MaushOp. Nourishment is a big issue and should <br /> continue Once the gall is completed. The sheet piling will be underneath and <br /> encapsulated. It will be s' down and will meet p rforman a standards. <br /> Machinery will come down through the access road. Mean ow water * - <br /> .1 Ir. Sherman asked if they were putting three stones vertically on top Of <br /> One another? He would like t0 see it drawn conceptually accurate. He has <br /> been to the site and would like to run this by Coastal Geologists Jim <br /> O'Connell and Rebecca Haney. <br /> Ms Boretos asked what provisions were made for water percolating down the <br /> bank. Mr. Hayes advised filter fabric will be used. <br />
The URL can be used to link to this page
Your browser does not support the video tag.