Laserfiche WebLink
21 September 2000 <br /> Page 5. <br /> Mr. Grotle advised this was approved by Board of Appeals pending Conservation and <br /> he has a new date set for another variance for setback from the coastal bank. <br /> Mr. Talbot pointed out the pool is going to be in the coastal bank. Mr. trot l e stated it is <br /> all lawn but meets the criteria for coastal bank and does not meet the function. <br /> Public comment; none. <br /> VOTE: Motion made and seconded to continue the hearing to 5 October at 8:00 p.m. <br /> at the request of the applicant. Unanimous Vote. <br /> HEARING CONTINUED. <br /> 8:05 PETER K. MORAK, 76 Triton Way, continued from 17 August 2000. Brad Holmes was <br /> present for this hearing. This was continued for review and input from DEP. <br /> Iver. Sherman spoke with Jim Mahala of [SEP and offer this conversation, he would <br /> recommend approval with the condition that if sheet piling within the revetment is <br /> exposed during a storm event, it must be removed within two weeks or the entire bank <br /> reveted. Mr. Holmes agreed and stated his client would want to do that. <br /> Ms Boretos asked if Mr. Mayes did anything about weep holes? qtr. Holmes stated they <br /> willr be installed and this can be conditioned. <br /> Public comment: none. <br /> TOTE: Motion made and seconded to accept the amendment with the condition <br /> on the sheet piling as stated by fhe Agent. Unanimous Vote. <br /> Weep holes will be conditioned, <br /> AMENDMENT ACCEPTED. <br /> 5:10 CHILT N DEVELOPMENT INC, 132 Waterway,gray, continued from 31 August 2000. <br /> Michael Prot l e was present. This was continued for an on-site w1fh Ms. Boretos. They <br /> will leave the retaining wall up and vegetation will be left in place. <br /> VSs. Boretos. stafed the applicant has made a good faith effort to accommodate her <br /> concerns. He has moved the house back and reconfigured the pool. She asked that <br /> this be shown on the plan. There is a lot of viburnum and clethera they will try to save. <br /> They will provide a plan showing hove that will occur. She asked for a letter saying that <br /> clients on bath lofs will pay for the services of Peter Fletcher. <br /> The Chair advised the coastal bank runs right'through the pool. Nis Boretos stated this <br /> site is only performing flood the control funcflon. With the gall and plantings, it will serve <br /> as flood control. There is a lot of natural veefation. This is a rebuild but the client has <br /> left an unusual amount of natural vegetation. it will be conditioned there will be no <br /> cuffing. <br />