My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/18/2001 CONSERVATION COMMISSION Minutes
>
1/18/2001 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2018 5:02:38 PM
Creation date
2/28/2018 1:07:42 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/18/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
18 January 2001 <br /> Page 6. <br /> going'to leave it in place because that was easier but as they work their <br /> way out of the project they can pull the sheathing out; it does not need to <br /> e there, only to do the excavation. It can be re-used as they move <br /> along. <br /> Mr. Sherman asked hover much of the existing rock on the face is going t <br /> he removed? Mr. Borselli stated all of it. Mr. Sherman stated then they <br /> will dig the hole and taut in the sheathing and asked ghat is the <br /> sequence? <br /> Ms Boretos asked where the material they remove goes? Mr. Cook <br /> advised they will do a section, thea pile things all around them. The <br /> .rocks are moved to where they can grab then again but the toe stones go <br /> in fiat and then they build all the way up. If steel is not put there, they <br /> cannot dig T do ern. Mr. Sherman stated there is a "bit of magic" in this <br /> one; this is going to be very saturated. Mr. Borselli stated that is why the <br /> sheathing is needed. <br /> FIs Boretos stated when she was there at mid-high tide yesterday; there <br /> was approximately 2-3' of water right where they are looking to Taut this <br /> roadway. she asked, during a high title, and particularly during a storm <br /> or spring tide, how are these rocks and this sand going to prevent water <br /> from getting to the edge of what they are excavating Mr. Cook stated <br /> this work could only be done at lour tide. There cannot he any storms or <br /> waves or it would be held u . <br /> Mr. Borselli stated they are not opening up the whole-thing, only little <br /> hits at a time. The crane can only reach so far, so it will be done in <br /> manageable small sections. <br /> Mr. Cook stated the idea of the sand plateau, retained by a temporary <br /> rove of stones, is to raise the elevation so that this can be done. <br /> Ms Boretos asked how high the road will be from the existing beach? It <br /> will be about 3'. Mr. Cook stated as high as the road built last staring. <br /> Mr. Borselli stated that hart is the same as under the Moran proposal. <br /> Mr. Sherman asked if they are building the outside temporary retaining <br /> wall from the stones removed and only- doing a sm.Wl section at a time, <br /> how will there he enough stones to do the whole wall? Mr. Borselli <br /> stated they are going to taring in some stones. The proposed toe stores <br />
The URL can be used to link to this page
Your browser does not support the video tag.