Laserfiche WebLink
4 <br /> I <br /> In Diane's opinion,-this is still below mean high water. Mr. Hayes said he is required by law to <br /> use the benchmarks he has. <br /> The applicant must receive the approval of the other permitted agencies Chapt 9 i, Amy Corp <br /> and M PA before Cons Com approval# <br /> } <br /> Mr. Hayes then discussed the issue of sface runoff and the concrete swl . It is designed so <br /> the water shedding off the next lot does not undermine these stones. It will be sealed with i ' <br /> yards of concrete between the 2sectios, it will not be on the surface so as not to diffuse the <br /> wave energies. <br /> Peggy suggested dealing with the drainage problem in the upland area with a dry w .11 and <br /> leaching facility. <br /> Mr. Mayes said if that is a special condition by the Con Corn,then it would be prudent to <br /> engineer that. Peggy would hope the Commission would see it on the plan presented to be <br /> approved, <br /> Public Co ' nent: <br /> Jing Kelly, direct abutter. He stated, as it stands today,when tide is high, it is 4 feet up the wall. <br /> You cannot walk by because of the stones in the ocean and now they are proposing making them <br /> lamer. He is not sure this is a good plan; pcoople will not be'able to walk by the beach here. <br /> Elliot asked Mr. Mayes if this lien will be held and no further extension into the grater? Mr. <br /> Hayes said that is correct. The pitch of the gall will change about 4 degrees, <br /> Diane noted the notice of intent needs to be amended to add annual beach nourishment <br /> Mr. Kelly stated this lot has been raised 4-5 feet by adding fill so now it is higher than his lot and <br /> the water therefore runs off onto his lot. <br /> Mr. Hayes suggested they can address that by extending the retaining wall and putting in a dry <br /> well. He understands the concerns about the drainage and about the style. <br /> Elliot agreed this is something that needs attention. <br /> Diane asked Ir. Kelly to look at his lawn and see what can be dome, <br /> l r. a es said this will designed by e thArm Corps manual. <br /> yy <br /> Len made a motion to continue the hearing to.August 22nd at 7:10, at the applicant's <br /> request. John seconded the motion. All members were in favor -0** <br /> Diane notice people in the audience dere for the earlier Cordair hearing. They believe the <br /> hearing has been stalled for the entire summer on purpose. <br /> Diane explained she understands their frustration but it is not unusual to continue hearings <br /> several tunes. They requested the hearing be at a later time sine they are corning Brom Boston. <br /> i <br /> Len made a motion to change the Cor air hearing from Aug. 22 at 7:05 to Aug. 22n'at <br /> 7:45 p. . John seconded the motion. All members were in favor 4-0 <br /> NEW BUSINESS <br /> Deno permit for I I Harbor Ridge Road. <br /> Russell Lore property owner was present. <br /> Foggy explained an RDA was filed for con truetion of a new house,the Commission verified the <br />