My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/9/2007 CONSERVATION COMMISSION Minutes
>
8/9/2007 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 5:33:24 PM
Creation date
3/5/2018 11:21:14 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/09/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> r <br /> MAS E CONSERVATION COMMISSION <br /> Minutes of August 9, 2007 <br /> Public Hearings <br /> Mashpee.Town.Hall Meeting loom 1 <br /> Commissioners Present: Jack F it sin on (Chair), Ralph Shaw (vice Chair),-Jeff <br /> Cross, Cass Costa, Leri Pinaud, Lloyd Allen and John Rogers <br /> Staff Present: Drew McManus (Conservation Agent) <br /> Jack Fitzsimmons called'the meeting to order at 6:5 5 p.rn. <br /> ire Hearing__ <br /> 1, Administrative Approval SE 43-2423 Little beck Lane) <br /> Jahn Graci(contractor) submitted an ad*str tive request t increase the height of <br /> the retaining wad on the left side of the propel at-26 Little Neck Lane. Presently <br /> the retaining' wall in lace does not match the grade of the coastal bark that has been <br /> p <br /> disturbed as a result of house construction. The wall is to be raised by 1 foot in <br /> height, then backfilled and planted with bearberry for erosion protection. <br /> Motion made, seconded and unanimously carried to approve administrative request <br /> . Approve Minutes from 7/12/07 <br /> Motion made, seconded and unanimously carried to approve the minutes from <br /> 7/12/07 <br /> Hearing Agenda: <br /> 7:00 p.m. Marie vilta, 18 Little Neck Lane(Install Title v Septic System-RDA) <br /> John Doyle contractor represented the applicant and described the project. The agent <br /> conditioned that siltfence and hay bales be used because of the location of the project t <br /> the nearby resource areas (coastal bank on both sides of house). The contractor meed to <br /> put hay bales and silt fence in place. The went recommended approval. <br /> Motion Ornade seconded and unardmously carried for a negative determination � <br /> 7:03 p.m. Blanche Pozerski, 83 VVW p r iU Circle(permit existing plea-ATF N01) <br /> Rob Braman(Braman Engineering)represented the applicant and described the proposal. <br /> Cass Costa recused herself from the hearing, W. Braman described the history of the <br /> project to thecommission'. The existing pier was denied perniitting by the Town of <br /> Mashpee back in the-early Bos; however the pier was issued a superseding order of <br /> conditions from the DEQ. The applicant is now seeking permitting of the e3dsting pier <br /> through the town of Mashpee, however, information on file with DEP and 1lrl shpee did <br /> not match what is existing in terns of pro)dm <br />
The URL can be used to link to this page
Your browser does not support the video tag.