Laserfiche WebLink
r� <br /> would be reasonable to condition the project to construct the wall at the carne time or right after the sand <br /> is deposited. <br /> Motion Ornade, seconded and unanimously carried to close and Issue r <br /> 6:12 Aris Pappas (387 M norn s o Road) install a pool & patio, retaining wall &fence, relocate <br /> existing mitigation plantings and relocate & maintain a four foot path - RDA "C 'd to November <br /> 29 @ <br /> 6.#OOp * <br /> Resource Area: <br /> Material submitted, <br /> [30:20] The applicant has requested a continuance to November ber 29, 2012. <br /> Motion Ornade, seconded and unanimously carried to continue to November 29, 2012 at 6:00pm <br /> 6:15 Eileen Tye (1180 Waterway) Repaidreplace a fisting pool apron in same footprint- RDA <br /> Resource Area: Buffer Zone to Coastal BanklLand Under Ocean <br /> Materiasubmitted. Site Pram 2 (handrawn) Owner <br /> [30:5 Eileen Tye explains than the existing concrete is badly cracked and would like to replace it in the <br /> same footprint. Agent McManus states that the project is straight forward but asks M . Tye about the <br /> accessibility. Ms. Tye says there is an existing fence area that was damaged from the storm that they <br /> need to repair but will use it as an access for the project. <br /> Motion crude, seconded and unanimously carried for a Negative Determination <br /> :1Stanton Healy (98 suer mersea Road) Remove three hazardous trees - RDA <br /> Resource Area: Coastal Bark, Buffer Zone to B VW <br /> Material submitted. Proposed Site Plan 2004 (hard noted) Connolly Tree <br /> [33:20) Joe Connolly from Connolly Tree Services is representing for the homeowner and explains than <br /> there are three pine trees that are leaning towards the dwelling and are showing bark beetle activity <br /> which has weakened the trees. <br /> Motion crude, seconded and unanimously carried for a Negative Determination <br /> 4) Ma hpee Waterways Mashpee Ruler Dredge Proposal <br /> Iden Bartel from the Waterways Commission explains that the project is a viable project dollars and <br /> sense wise-because it is a place to put the sediment from dredging of the Ma hpee River. Mr. Sweet <br /> would like to know w what the purpose of the dredging is and Mr. Bates states than it is for the purpose of <br /> safe navigation. Chairman Fitzsimmons asks if it has been endorsed by the Flarbor easter and Mr. <br /> Bates says that he does not know except that the Harbormaster is fully aware of the project as he is on <br /> the Waterways Commission. Mr. Bates states that he has not sought endorsements by anyone except <br /> for the ability to work with the Conservation Commission to protect the town and the waterways <br /> Commission. <br /> Mr. Bates states that he is present to address the questions that were brought up at the last meeting. <br /> The fiat question asked was if the area of depression has to be capped and Mr. Bates says than they <br /> ' can complete the project in one to two years. They plan to scrape off the berm around the site as a <br /> 3 <br />