Laserfiche WebLink
4 <br /> 7:03 Matthew blase NOI SE -2603 James Circle)—Dock <br /> Applicable Resource Area: Johns PondlBVW <br /> John Slavinski from Cape & Islands Engineering is representing the homeowners and i <br /> proposing the construction of a dock on John's Pond with " schedule 80 galvanized pipes <br /> which will be driven into the bottom of the pond. The walkway will be mechanically connected <br /> to the pipe's. IIIb. Slavinski explains that since this is a Natural Heritage area that they <br /> proceeded to file with'therm a few months ago and have had a study completed on the <br /> endangered species in the area which has been approved. The plans also received harbor <br /> raster approval. <br /> Motion made, seconded and unanimously carried to Close and Issue. <br /> 7:06 Warren Fields RDA 12 Po ponesset Island Road) Title V septic upgrade <br /> Applicable Resource Area: LSCSF& Coastal Bank <br /> John Slavinski from Cape & Islands Engineering is representing the homeowner and explains <br /> the agreement with the Board of Hearth. The property had changed hands approximately two <br /> years ago and an agreement with the Ilashpee Board of Health was made during that <br /> process stating that the current owner would be allowed to stay until the end of fall and n <br /> other person would be allowed to occupy the house_until the septic system has been - <br /> upgraded. Mr. Slavinski states that they are more than 100'from the top of the bank but the <br /> proposed location of the new system is in the flood zone. <br /> Agent McManus states that this project is straight forward and a significant improvement from <br /> the existing conditions. It will be a treated system with denitrification technology. <br /> Motion made, seconded and unanimously carried for a Negative active eterminati n <br /> 7:09 John & Kathleen Bibo NOI Captains Row)—2nd Level Addition & septic Upgrade <br /> Applicable Resource Area: Coastal BanklSalt marsh <br /> Andrew Garulay from Down Cape Engineering is representing the homeowner and explains <br /> that they would life to remove the roof to the dwelling and add a 2" stony which will increase <br /> the bedrooms from 3 to 5. In order to proceed with the addition, the owner's will need to <br /> upgrade the septic system. Currently, there is a leaching facility and the owners would like to <br /> put in an IA IIIIEorofast system which the leaching component will be as far array from the <br /> resource areas and also elevated higher than the ground water. It Will include a blower <br /> located about a foot behind the slued. No expansion of foot print but will place drywells to <br /> catch the roof runoff at both ends of the house and outside of the coastal banks. <br /> Motion made, seconded and unanimously carried to Close and Issue <br /> 7:12 Michael &Judy Welch RDA (277 M n m so Road)—Extend Plafform PlatformCantilever <br /> Applicable Resource Area: LSCSF Coast l Bark Bulkhead <br /> John Slavinski from Cape & Islands Engineering is representing the home owner. They have <br /> an existing vinyl bulkhead with platform and a 65' ramp leading to a 1 OA Float. The area is an <br /> ACEC designation (Area of Critical Environmental Concern) and Nor. Welch would like to go a <br /> little deeper and farther out with the ramp and float but they can not put piles in. The idea is to <br />