My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/1/2010 CONSERVATION COMMISSION Minutes
>
4/1/2010 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 5:18:42 PM
Creation date
3/5/2018 3:04:03 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
04/01/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
k t <br /> j <br /> _ w <br /> 7:06 Paul Gardner RDA Sakonnet Drive) Remove Two `trees & Prune others <br /> Applicable Resource Area: Inland Bank leading to Johns Pond <br /> Tian Pin ino from Bartlett Tree is representing the homeowner stated that a large Hickory has been <br /> removed_ e . lis ..t—was leaning.towards the house and had become.a hazard to the dwelling which <br /> Agent McManus confirms that it was an immediate hazard. Mr. Pinzino also would like to do some <br /> pruning on the side of the house to lessen any potential damage the house along with a tree on the <br /> other side where the top had snapped off. There is a large oak in the front that overhangs the house <br /> and walkway that could damage vehicles in the driveway with fallen branches. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> 7:09 Jenny Kou loris RDA(18 Starboard Lane) Remove Tree, F epair stone Wall and Mitt ation <br /> Applicable Resource Area. Buffer to Flood Zone <br /> Matthew Foley from Casey Landscape is representing the homeowner. He explain the pitch pine in <br /> the rear of the property along a stone wall and the roots of the tree are damaging the wall. They <br /> would like to remove the tree and plant sic shrubs along with repairing the stone wall. Agent <br /> McManus states that it is straight forward with very minimal disturbance to any resource area. <br /> Motion made, seconded and unanimously carried for a [legative Determination <br /> 7:12 John's Pond,l rth,cove Association Shorewood Drive Remove Tree <br /> Applicable.Resource Area: John- Pond <br /> Bill HoImes,.P rider t of John's Fond North Cove Association a plai res the existence of a-pitch pine <br /> that has ski wr + v�dence of bark beetle damage and they would life to remove the tree to preserve <br /> the health of,two existing oak trees next to it. Agent McManus says that the tree does have pine <br /> borer darn . The Agent also mentions that it is apparent that someone has "topped' the oak trees <br /> and it is noted.that the trees should not be cut as the beach is the property of the Commonwealth nor <br /> was any request made to the local concom for the topping of the two oak trees. lir. Sweet <br /> recommends having a couple of the other pines in the vicinity examined for illness as well and Agent <br /> McManus states that he will tale a look at them. Mr. Allem would like to suggest replacing the pine <br /> with another tr ,,possibly another oak tree. <br /> Motion mace, seconded and unanimously carried for a Negative active Determination <br /> r i <br /> i <br /> 7:15 Mashpee health Care N01 (161 Falmouth load) Replace a Falling septic system with 6000 Gallon <br /> Pump Chamber/Pump station <br /> Applicable Resource Areax Buffer to Inland Bank armored and Buffer to B VW <br /> Lori McDonald from Banter Nye Engineering is representing Mashpee Health Care and explains that <br /> they would like to rplace an existing failed Title V septic system with a new sewer pump station and <br /> forced main which will connect 161 Falmouth Road through 133 Falmouth Road up Doisy Hole Road <br /> to anew treatmer,�ti acility-located at Cotuit Meadows. Silt fencing will be installed adjacent to the <br /> wetland resource,area and trees and shrubs will be cleared within the silt fence area. A new 6000 <br /> gallon pump facility will be installed in the back of 161 Falmouth Road and will connect into the <br /> isting 18000- alI ,septic tank to the pump chamber which will pump to the forced main. The I i n e <br /> itself is 4 PVC. Once everything is installed, the existing facility will be taken off line and the leaching <br /> fields will b ,p'uirr� d Ary and abandoned. The trenches will be backfilled and the area will be re- <br /> jr <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.