Laserfiche WebLink
vegetated with loam and seed. The silt fencing will stagy until the seed has taken hold. There may be <br /> some possible clearance near the leaching fields to allow it to be pumped/drained. The pipe will be <br /> laid next t t the asphalt except ire one small location at 133 where a p proximately 20' of pave rn ent will <br /> need to be cut. Mr. Cross and Mr. Allen recommended that Schedule 80 pipe be used instead of 40 <br /> because of durability. <br /> Motion made, seconded and unanimously carried to Close and Issue <br /> Motion made, seconded and unanimously carried to adjourn the meeting at 8:07 pm. <br /> Respectfully submitted, <br /> Cris Carpenter <br /> Administrative Secretary <br /> ii 44 1{ <br /> 1 5•SYS1� 114, i 3f 4 <br /> M I. <br /> • t <br /> f�1 t J{1[,i •- <br /> VL <br /> r , <br /> a <br /> y <br /> 4 <br />