Laserfiche WebLink
Agent McManus mentions that Mr. Alien was going to research methodology of installing gates <br /> and insuring that they will be more difficult to remove. Mr. Allen suggests welding across the <br /> bottom of the pipe. <br /> HEARINGS <br /> 7:0 0 Jar es Regan S SE 43-2611 Car u ga Ave.) Never ' sears o n a I dock - Nol Cont"d to March <br /> 10, 2011 <br /> Resource Area:Johns Pond: Lana Under Water <br /> Material submitted. <br /> Representative requested continuance. Agent McManus informs the commissioners that this has <br /> been an ongoing continuance because Mr. Regan has been dealing with Natural Heritage as there <br /> are fresh water muscles identified in the area. Until the Commission hears from.Natural Heritage, <br /> an order of conditions can not be issued. The Agent has sent an email to Mr..Regan stating that <br /> this will be the last continuance allowed since it has been almost a year since first submitted. <br /> Motion n made, seconded and unanimously carried for a continuance until 3/10/11 at 7:00pm <br /> 7:03 Katherine & Brown Lin arnfelter S -2642 Seconsett Point Road)d Replace la ce existin <br /> licensed bulkhead in same location - Nol <br /> Resource Area: Coastal Bank, LSCS `, A C C, Land Under ocean <br /> Material submitted., Plot Plan 12129110 Falmouth Engineering Cross Sections & Bblkhe Design <br /> 12129110 Falmouth Engineering <br /> Jack Vaccaro frorn.vaccaro Environmental is representing Falmouth Engineering for this project.- <br /> The work proposed-is on the.southern part of the lot on the-Waquort Bair side. Mr. Vaccaro <br /> explains than there is an existing timber bulkhead that is in a state of disrepair and needs to be <br /> replaced. It is right up against the shore of waquoit Bay and extends from a riprap seawall. The <br /> wall is approximately 11/2' —2' tali at the highest point and they wouId life to replace it with vinyl <br /> sheeting. The new wall will be installed directly behind the old timber so there will not be any <br /> further encroaching on the waters of waquoit Bay. The old timber bulkhead will come out first to <br /> allow the piles to be driven in. They will rem' ove 10-15' of bulkhead at a time to keep it in <br /> manageable sections and it is estimated to be a section per day repair. The work will include <br /> tearing out the bulkhead, pulling back the slope enough to allow the new vinyl piling to be put in <br /> place and then driven with a vibratory haminner which is a mechanical device mounted on a small <br /> excavator. Agent McManus asks about the construction access and if there will be any kind of <br /> disturbance to the vegetation close to the bank along the bulkhead. Mr. Vaccaro can see an area <br /> that is less dense in trees that he proposes to use as an access. He feels that they can maneuver <br /> the mini excavator through there. Another option is that they could bring the equipment in along the <br /> edge of the'lot on the north side and possibly they will use both accesses as the timber comes out. <br /> The Agent also wants to know if the bulkhead continues down into the abutting property and Mr. <br /> Vaccaro confirms it does but that portion is not in their control and the new bulkhead will continue <br /> up to that point. Mr. Sweet points out that the.new vinyl looks to be higher than the existing timber <br /> which Mr. Vaccaro confirms stating that it is approximately 1'/' higher and believes that the <br /> engineer didn't think the current height was high enough. <br /> Motion made, seconded and unanimously carried to close and Issue <br /> 7:06 Marion Oust-Lievense SE 43-2646 Kim Path) Proposed additi n.arid septic repair-N01 <br /> Contrd to April 7. 2011 @ ':oo m <br /> Resource Area: Buffer Zone to Freshwater Wetlandl Cedar Swamp <br /> 2 <br />