Laserfiche WebLink
Material submitted: <br /> Representative requested continuance. <br /> Motion made, seconded and unanimously carried for a continuance until 4/7111 at : 0prn <br /> 7:03 Kerry McNamara S -2641 James Circle) Remove ve existing retaining walls, stairs and <br /> walkways and-replace with 'natural grade and a 2' stone/block stone/blockretaining wall - NOI Cord <br /> from 112 71 <br /> Resource Area: Inland Bank/Buffer to Johns Pond <br /> Material u mitte : Plans to Accompany l e l pg -12JO311 0 MacDougall Surveying Plans to <br /> Accompany N 1 (Proposed Scheme) 2110111 MacDougall Surveying <br /> Gregg MacDougall from MacDougall Surveying is representing the applicant and explains that this <br /> project proposes to remove wood retaining walls and stairs that are dilapidated and produce <br /> gentle .1 slope with a small retaining gall at the bottom. Agent McManus mentons that the <br /> abutters were present at the January 271' hearing and they had some concerns of the slope going <br /> into his property which was at a lower elevation. The Agent wanted to be sure that it states on the <br /> plan the area of vegetation.that is not to be disturbed on the property line. The abutters had wanted <br /> some clarification of what exactly would be cleared and where the equipment was going in the <br /> interest of maintaining the slope between the properties. The abutter had submitted a letter stating <br /> that they have communicated ted Fr ith the homeowners and have agreed to the plan. The Agent states <br /> that the plantings being proposed are not required mitigation but are just being proposed by the <br /> owner as there is not any mitigation required. Mr. MacDougall also mentions that the abutter was <br /> also concerned with soil erosion on his side of the lot where it slopes down but as said previously., <br /> the vegetation will not be disturbed on that slope and it does state that on the plans. <br /> Motion made, seconded and unanimously carried to Close and Issue <br /> 7:12 Mark Sullivan 18 lied Brook load) Remove ve 1 pine trees & construct 8' aide deck to <br /> access.door— NOI Cort"d to February 2 ,, 2011 @ 7:03pm <br /> Resource Area: Buffer Zone to Coastal Bank (Ancient Line) & Freshwater Wetlands <br /> Materialsubmitted: <br /> - I <br /> William Megan is present for Mark Sullivan and Agent McManus explains to hires that Conservation <br /> had tried to contact him in regards to continuing this hearing due to outstanding takes that have not <br /> been paid-by Mr. Sullivan. Mr. Megan states that,Mr. Sullivan had carped him to ask him to attend <br /> this hearing tonight for hire as he had a-family emergency. Agent McManus states that this hearing <br /> will still need to be continued as it is a town-gide policy to continue hearings that have outstanding <br /> bills. <br /> Motion made, s.econded and unanimously.carried for a continuance until 2124111 at 7: pm <br /> 4 Establishment of Oversiciht Committee for the Quashnet Diver Pro'e t: <br /> Agent McManus would like to establish an oversight committee that includes representation from <br /> the community, who are involved environmentally, have some nor-pr fit and/or state colas. The <br /> Agent feels that this will be a very big project and down the line, the deeper involvement in the <br /> project, he will need assistance. Presently, Haley & Aldrich are preparing a budget outline for <br /> events moving forward and once submitted, he will have a better idea of the scope of the project. <br /> The Agent mentioned that there was a.Cranberry Management Committee when the bogs were <br /> being worked on about 20 years. Agent McManus believes that this project will be one of the <br /> biggest habitant projects the Commission has ever taken on as this is over'20 acres of complete <br />