Laserfiche WebLink
7:27 John & Catharine Brennan SE 43-2660 Fiddler Crab Lane) Demo/rebuild single family <br /> home with attached garage and mitigation/restoration Cele "to Jure 2 @ Rm -NOI <br /> Resource Area; <br /> Hateful submitted.- <br /> The <br /> ubmitted.The representative has requested a two week continuance. <br /> Motion made, seconded and unanimously carried for a continuance until 6/2/11 at 7:06 pm <br /> 7:30 Dale Fishman cliffside Lane) construct two pergolas; one in the driveway and the other in <br /> the courtyard along with additional plantings -FDA <br /> Resource Area. Buffer Zone to Coastal Bank <br /> Maten'al submitted. Landscape Layout 517111 Jan Gleysteen Architects (Remodeling Plus) <br /> Scott Goldstein is representing the homeowner and explains that they are proposing to construct <br /> two pergolas which will require four sonotubes each. Agent McManus states that both pergolas are <br /> being constructed in previously disturbed areas and will have no impact to the resource areas. <br /> Tori Dempsey from McNamara amara Brothers reviews the area in the courtyard for new plantings. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> 7:33 Bruce croft (19 Waterline Drive) General landscape renovations including shrubbery, mulch <br /> and hardsape - RDA <br /> Resource Area: LSCSF, Buffer Zone to Coastal Bank <br /> Material submitted* Croft Residence 313111 Maffei Landscape <br /> Robert Maffei from Maffei Landscape is representing the homeowner and explains that they are <br /> proposing to create a patio in the backyard and landscape the entire site including new vegetation <br /> in the front yard. They will manage and grade a drain s gale in the backyard and use a conservation <br /> mix to ever certain areas. Mr. Maffei states that they will retain the grade with boulders on the <br /> sides of the house and to re a etate those areas. The Agent wanted to point out that the existing <br /> pathway needs to be ' and asks Mr. Maffei if they could revegetate that area to bring it back to 4 . <br /> Also, there' were kayaks being stored on low growing shrubs and he asks that they be removed. <br /> Mr. Allen recommends berry producing shrubs. <br /> Motion made, seconded and unanimously carried for a Legative Determination <br /> 4Update on Santuit Pond Dam' —The Sarntuit Pond Dara is in a state of failure where seepage is <br /> occurring under the darn and has been for the last year. The engineers, Weston n & Samson, have <br /> completed 25% of their engineered plans which show a proposal tore-grade the stretch between <br /> the main darn and the auxiliary (about 100') and then to replant with grass and install a rip-rep on <br /> the pond side. The fish ladder will be replaced with hard grade aluminum. The darn will be <br /> reinforced with concrete. The entire project will be permitted to begin by the end of October; once <br /> the herring fry leave the pond. They will be taking a lock at the berms alongside the river because <br /> approximately 3 creeks ago, the berm was undermined and opened a connection from the river <br /> into the bog which hundreds of herring got through. The Agent had to open all the culverts t <br /> each bog to allow passage back. He is concerned about other areas that will soon be failing and <br />