My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/15/2011 CONSERVATION COMMISSION Minutes
>
12/15/2011 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 5:02:46 PM
Creation date
3/7/2018 9:59:47 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
12/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F <br /> 7:12 Lawrence Bacon *'043-2 (56 Waterway) Install 1 ' of timber bulkhead along the edge of <br /> Pppnesset Creek - <br /> se Area: Coastal Bankl LSCSFI Land Under ocean <br /> Material submitted: Proposed Wooden Retaining Mall 11122,111 Cape & Islands Engineering 1 <br /> Buffer Strip Restoration 1215111 Vaccaro Environmental <br /> Jack Vaccaro from Vaccaro Environmental is representing the homeowner and explains that there <br /> is a small band of shrubs along the coastal bank that consists mostly of ragota rose that will be <br /> affected by the proposed construction. The project proposed is 100of bulkhead installation that i <br /> made of wood timbers. A rover of dead-men, horizontally installed piles will be installed 10' back on <br /> the-landward side and anchored to the base of the wall using tie runs. There will be excavation <br /> required for the.pla ement of the 10 piles for the dead-men and then filled and re-graded. The <br /> existing lawn grades significantly towards Popponesset Creek so they would like to charge the <br /> grade to change the water runoff to be infiltrated into the ground. The 10' zone that will be affected <br /> by the installation of the bulkhead and dead-men will be revegetated with native vegetation. <br /> Agent McManus asks-why they were going with timber instead of vinyl and Mr. Slavinski answers <br /> that other local homes in that area were done the same so they were staying with the timber. Mr. <br /> Cook asks what the reason for the project is and Mr. Vaccaro responds that the owners are being <br /> proactive. Several properties in that area are in Much gore condition and the owners wanted to be <br /> proactive so as not to lose any more saltmarsh or bank from erosion <br /> Motion rude, seconded and unanimously carried to Close and Issue <br /> 7:15 R ichard Barry, Trustee 'x`043-2 Waterway) Instal1100' f timber bulk head along the <br /> edge of P pp nesset Creep - N01 <br /> Resource Area. Coastal Baok,, LSCSF, Land Under Ocea' n r <br /> Material submitted: Proposed Wooden Retaining f Wall 11231J Cape & Islands Engineering/ <br /> Buffer Stain Restoration 1215111 Vaccaro Environmental <br /> Jack Vaccaro is also representing this home owner and explains that it is a carbon copy'of the <br /> project that was just heard. This property also has a band of mostly rola ragosa at the top of the <br /> bank. This property has more of a slope than the previous project so it will require more landfill to <br /> re-grade. The mitigation plan mirrors 56 Waterway. <br /> Motion made, seconded and unanimously carried to Close and.lssue <br /> 7:18 Michael Margolis **043-2677**-(68 Bayview Road) Construct single family dwelling with <br /> - driveway, landscaping, vista pruning and all appurtenant utilities - <br /> ee Area: LSCSF, Buffer Zone to Salt Marsh, Bordering Vegetated Wetland <br /> Material submitted: Proposed Site Plan 1216111 Cape & Islands Engineering <br /> .hack Vaccaro is also presenting this project and explains that this applicant is a potential owner that <br /> would like to propose ai single family home construction. - It consists of two parcels that are <br /> separated by water that passes through but still a part of Hamblin Pond. The property currently has <br /> two 'derelict' structures that at one time might have functioned as a shed. There is also a small <br /> privy located on the site. Mr. Vaccaro. explains that they will be installing-a denitrifying septic <br /> system and placed as far-back from the wetlands as possible and most of it will be located outside <br /> the 100' buffer. The home is designed to stay out of the 0' buffer except for a s.light incursion <br /> behind the house with a 35' vista window off the back of the house. The exact location of the vista <br /> window will be decided upon after the frame of the house has been set and Mr. Vaccaro will consult <br /> with'the Agent at that time. The two old structures,will be removed and the affected areas will b <br /> restored by planting native wetland type vegetations. There is also another small area by the,shed <br /> that could provide an opportunity for additional plantings. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.