My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/7/1982 BOARD OF HEALTH Minutes
>
7/7/1982 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2018 5:07:29 PM
Creation date
3/19/2018 3:16:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
07/07/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> { <br /> i <br /> { F <br /> all Town buildings and material at the land fill. The r� Con- <br /> tractor shall. furnish and. a for all fuel power needed <br /> to heat the buildings at the land fill. The Contractor shall <br /> x who will a at the facility <br /> furnish an equipment operator* <br /> whenever the facility is open a shall also supply an atten-, <br /> _ to limit the use .f the fac li <br /> dant ho ties shall e (1) <br /> • p and businesses to <br /> rte o iashpee residents , taxpayers <br /> In the facility it t assure that they all <br /> check all vehicles us � <br /> n <br /> have ashpe Disposal ss al s ick er on the vehicles at the - gate and <br /> .. w <br /> (3) to <br /> record the .amount. � <br /> l-.of daily volume received at the 'land <br /> i <br /> fill* These records will be entered neatly and accurately on <br /> _ <br /> . . the provideid forms. <br /> The filled-in forms sball. be furnished to <br /> the <br /> Board of Health weekly* <br /> . <br /> - rvis the lacing o <br /> The equipment ment operator will direct and <br /> . refuse in the <br /> land fill. The equipment operator will insure <br /> - <br /> that the refuse is placed at .thease of the slopes being <br /> worked* The equipment <br /> operator will -also operate the equip- <br />. . . ment necessary <br /> to work the land fills <br /> . . Ire icer area t e worked, t Contractor shall clear, grub, <br /> ontractor . sha l rem <br /> end trip the area. The ve and dispose_ <br /> . of the trees <br /> and brush. The stripped areas will be roug <br /> subsoil and sand h- <br /> X11 e to �-piled <br /> _ graded. The loam., �. .a e� y <br /> at suitable s a not to . interfere interfere with the <br /> - separatelyareas s _ <br /> ions normal operat <br /> f the land fill-. From November 15th to <br /> March 15th, the Contractor shall furnish and instal straw or <br /> { <br /> other suitable cover material over the stockpiled sand and <br /> _. <br /> oil t reent the. stockpiles from freezing* <br /> clayey s p <br /> The Contractor <br /> shall construct and maintain access roads to the <br /> e roads should grated o as to he puddle <br /> area -being Used* -T <br /> ` <br /> to the <br /> shoulders* ' The goads shall b rain- <br /> free and drained of <br /> • t tom: ublic can freely gravel n them. The Con- <br /> tained- so that <br /> tra1Pctor shall Bret the acce-ss, roads to control dust. <br /> The Contractor will direct that the public place the refuse at <br /> the base of the <br /> slo a The refuse shall be spread and compact- <br /> ' S <br />
The URL can be used to link to this page
Your browser does not support the video tag.